Test Description
WARNING: This page is about a different car, the 2002 GMC Yukon XL, 2002 GMC Sierra, 2002 Chevrolet Suburban, and 2002 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
The numbers listed below refer to step numbers in the diagnostic procedure:
- 3
This step tests for proper circuit operation up to the PCM connections. Remove the fuel pump relay to eliminate a flooding condition during this step. - 5
This step tests for proper operation of the ISS.