LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1688 (Hybrid Engine Electrical System 2.4L (Hp7)) >> Description and Operation >> Charging System Description and Operation >> Plant Assembly Mode

Plant Assembly Mode

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.

The BCM will increase charging voltage for the first 500 miles of operation in an effort to ensure that the 12 V battery is fully charged when the vehicle is delivered to the customer.