LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1635 (Engine Mechanical - 3.6L (2 Of 6)) >> Repair Instructions - On Vehicle (1 Of 2) >> Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (PCV Valve/Intake) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Positive Crankcase Ventilation Fresh Air Pipe
    GM1897768Courtesy of GENERAL MOTORS CORP.
  1. Connect the PVC foul air pipe to the PVC valve.
  2. Connect the PVC fresh air pipe (1) to the upper intake manifold.
  3. Install the engine cover. Refer to Fuel Injector Sight Shield Replacement (LY7)  or Fuel Injector Sight Shield Replacement (LCS) .