LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1459 (Automatic Transaxle - AF33-5 (Removal & Installation, Service & Overhaul)) >> Repair Instructions >> Shift Control Cable Bracket Assembly Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2003 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Installing Control Cable Bracket
    GM945418Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  1. Install the control cable bracket and bolts.

    Tighten:  Tighten the control cable bracket bolts to 23 N.m (17 lb ft).

  2. Route the control cable thru the cable bracket.
  3. Fig 2: Control Cable Retainer Clip Tabs, Cable & Control Cable Bracket
    GM978158Courtesy of GENERAL MOTORS CORP.
  4. Secure the cable to the bracket with a new control cable retainer clip. An audible snap will be heard when properly installed.
  5. Snap the cable end fitting onto the ball stud of the transaxle range switch lever.
  6. Fig 3: View Of Battery Tray Bracket Bolts
    GM951487Courtesy of GENERAL MOTORS CORP.
  7. Install the battery tray bracket.
  8. Position the battery tray bracket and install and tighten the screws.

    Tighten:  Tighten the battery tray bracket screws to 16 N.m (12 lb ft).

  9. Install the battery cooling box. Refer to Battery Box Replacement installation procedure located in Battery.
  10. Fig 4: View Of Battery
    GM951451Courtesy of GENERAL MOTORS CORP.
  11. Install the battery.
    1. Insert the battery and tighten the battery hold-down screw.

      Tighten:  Tighten the battery hold-down screw to 15 N.m (11 lb ft).

    2. Connect the positive battery cable to the battery.

      Tighten:  Tighten the positive battery cable bolts to 17 N.m (13 lb ft).

    3. Connect the negative battery cable to the battery.

      Tighten:  Tighten the negative battery cable bolts to 17 N.m (13 lb ft).

    4. Install the battery cooling box cover and install and tighten the screws.

      Tighten:  Tighten the battery cooling box cover screws to 2 N.m (1.5 lb ft).

  12. Reprogram the radio stations.