Installation Procedure
WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
- Position the blower motor resistor forward retaining slots onto the forward retaining screws and the upper portion of the resistor into the HVAC module.
- Align and seat the resistor to the HVAC module.
- Install the resistor rear retaining screw and drive until just secure.
- Tighten all the resistor retaining screws.
Tighten: Tighten the screws to 1.6 N.m (14 lb in).
- Connect the blower motor resistor electrical connector to the blower motor.
- Connect the wiring harness electrical connector to the blower motor resistor.
- Install the RH lower I/P insulator panel. Refer to Closeout/Insulator Panel Replacement - Right in Instrument Panel, Gages and Console.
- Install the BLO MOT MaxiFuse® #49 to the I/P electrical center.
- Install the cover to the I/P electrical center.
- Install the front floor kick-up panel. Refer to Kick-Up Panel Replacement - Front Floor in Interior Trim.
NOTE:
Refer to Fastener Notice in Cautions and Notices.