LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2003 >> Safari Van Cargo, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 129 (Engine Controls - Removal & Installation, Overhaul) >> Air Induction Systems >> Supercharger >> Installation

Air Induction Systems: Supercharger: Installation

WARNING: This page is about a different car, the 2002 Pontiac Grand Prix, 2002 Chevrolet Monte Carlo, 2002 Chevrolet Impala, 2002 Buick Regal, and 2002 Buick Century. However, it is still accessible from the selected car via links, so may be relevant.
  1. If replacing the supercharger, install the manifold vacuum source, supercharger bypass valve, PCV valve and throttle body. Install the new supercharger "O" ring seals. Install the new supercharger gasket. Do not use any sealer on the gasket. Install the supercharger.
  2. Loosely install the supercharger right-side bolts. Loosely install the supercharger left-side bolts. Tighten the supercharger bolts starting from the center and working to the outside of the supercharger to specification. See TORQUE SPECIFICATIONS .
  3. Install the air cleaner intake duct. Install the accelerator and the cruise control cables with the bracket to the throttle body. Connect the vacuum hoses and electrical connectors as necessary. Install the fuel rail assembly. See FUEL RAIL & INJECTORS  under FUEL SYSTEMS.
  4. Install the MAP sensor bracket. Install the spark plug wires to the ignition coils. Install the supercharger drive belt. Install the EGR valve heat shield, nut and bolt. Tighten the EGR heat shield nut and bolt to specification. Install the fuel injector sight shield. Connect the negative battery cable. Inspect for fluid or vacuum leaks.