Circuit Description
WARNING: This page is about a different car, the 2004 GMC Sierra and 2004 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
The lock-off relay coil is supplied power whenever the ignition is in the Start or Run position. When the lock-off relay is energized it supplies power to the high pressure lock-off (HPL) solenoid and the low pressure lock-off (LPL) solenoid.
Fuel Lock-Off Relay Diagnosis
| Step | Action | Yes | No |
|---|---|---|---|
| Schematic Reference: Engine Controls Schematics Connector End View Reference: Engine Controls Connector End Views or Fuel Injection Control Module Connector End Views |
|||
| 1 | Did you perform the Diagnostic System Check Alternative Fuels - Engine Controls? | Go to Step 2 | Go to Diagnostic System Check - Alternative Fuels (Engine Controls) |
| 2 |
|
Go to Step 3 | Go to Step 5 |
| 3 |
|
Go to Step 4 | Go to Step 7 |
| 4 | Probe the relay coil ground circuit terminal (86) with a test lamp connected to B+. Is the test lamp illuminated? |
Go to Step 12 | Go to Step 9 |
| 5 | Inspect the AFS/4WS fuse. Is the fuse open? |
Go to Step 6 | Go to Step 10 |
| 6 |
|
Go to Step 14 | - |
| 7 | Inspect the AFS/PCM 1 fuse. Is the fuse open? |
Go to Step 8 | Go to Step 11 |
| 8 |
|
Go to Step 14 | - |
| 9 | Repair the relay coil ground circuit for an open. Refer to
Circuit Testing
and
Wiring Repairs
in Wiring Systems in the C/K Pickup Service Manual. Did you complete the repair? |
Go to Step 14 | - |
| 10 | Repair the relay switch power circuit for an open. Refer to
Circuit Testing
and
Wiring Repairs
in Wiring Systems in the C/K Pickup Service Manual. Did you complete the repair? |
Go to Step 14 | - |
| 11 | Repair the relay coil power circuit for an open. Refer to
Circuit Testing
and
Wiring Repairs
in Wiring Systems in the C/K Pickup Service Manual. Did you complete the repair? |
Go to Step 14 | - |
| 12 | Test for an intermittent and for a poor connection at the AF lock-off relay. Refer to
Testing for Intermittent Conditions and Poor Connections
and
Repairing Connector Terminals
in Wiring Systems in the C/K Pickup Service Manual. Did you find and correct the condition? |
Go to Step 14 | Go to Step 13 |
| 13 | Replace the AF lock-off relay. Did you complete the replacement? |
Go to Step 14 | - |
| 14 |
|
System OK | Go to Diagnostic System Check - Alternative Fuels (Engine Controls) |