Test Description
WARNING: This page is about a different car, the 2004 GMC Sierra and 2004 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
The numbers below refer to the step numbers on the diagnostic table.
- 4: By disconnecting the TR switch, the ground path of all TR switch circuits is removed and the PCM should recognize all circuits as open. The scan tool should display HI for all range signal states.
- 5: This step tests the TR switch wiring for an open or the lack of the signal voltage from the PCM.
- 6: This step tests the TR switch wiring and the PCM by providing a ground path through a fused jumper wire. When grounded, the scan tool range signal states should change to LOW.
- 7: This step tests the TR switch wiring and the PCM by providing a ground path through a fused jumper wire. When grounded, the scan tool range signal states should change to LOW.
- 8: This step tests the TR switch wiring and the PCM by providing a ground path through a fused jumper wire. When grounded, the scan tool range signal states should change to LOW.
- 9: This step tests the TR switch wiring and the PCM by providing a ground path through a fused jumper wire. When grounded, the scan tool range signal states should change to LOW.
Range Selector Displays Incorrect Range
| Step | Action | Values | Yes | No |
|---|---|---|---|---|
| 1 |
|
- | Go to Step 2 | Go to Step 3 |
| 2 | Observe the IPC gear range display while selecting each transmission range: P, R, N, D4, D3, D2, D1. Does each selected transmission range match the IPC display? |
- | Go to Intermittent Conditions in Engine Controls - 4.3L or Intermittent Conditions in Engine Controls - 4.8L, 5.3L and 6.0L | Go to Step 16 |
| 3 | With the scan tool, observe the TR Sw. A/B/C/P display. Does the scan tool TR Sw. A/B/C/P parameter indicate HI for all range signal states? |
- | Go to Step 13 | Go to Step 4 |
| 4 |
|
- | Go to Step 5 | Go to Step 10 |
| 5 |
|
10-12 V | Go to Step 6 | Go to Step 11 |
| 6 | Connect a fused jumper wire from the TR switch connector, signal circuit A, to ground while monitoring the scan tool TR Sw. A/B/C/P parameter. When signal circuit A is grounded, do any other signal circuits indicate LOW? |
- | Go to Step 12 | Go to Step 7 |
| 7 | Connect a fused jumper wire from the TR switch connector, signal circuit B, to ground while monitoring the scan tool TR Sw. A/B/C/P parameter. When signal circuit B is grounded, do any other signal circuits indicate LOW? |
- | Go to Step 12 | Go to Step 8 |
| 8 | Connect a fused jumper wire from the TR switch connector, signal circuit C, to ground while monitoring the scan tool TR Sw. A/B/C/P parameter. When signal circuit C is grounded, do any other signal circuits indicate LOW? |
- | Go to Step 12 | Go to Step 9 |
| 9 | Connect a fused jumper wire from the TR switch connector, signal circuit P, to ground while monitoring the scan tool TR Sw. A/B/C/P parameter. When signal circuit P is grounded, do any other signal circuits indicate LOW? |
- | Go to Step 12 | Go to Step 13 |
| 10 | Test the signal circuits of the TR switch that did not indicate HI for a short to ground. Refer to Testing for Continuity
and Wiring Repairs
in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 17 | Go to Step 15 |
| 11 | Test the signal circuits of the TR switch that did not indicate proper voltage for an open. Refer to Testing for Continuity
and Wiring Repairs
in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 17 | Go to Step 15 |
| 12 | Test the affected signal circuits of the TR switch for a shorted together condition. Refer to Circuit Testing
and Wiring Repairs
in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 17 | Go to Step 15 |
| 13 | Test the ground circuit of the TR switch for an open. Refer to Testing for Continuity
and Wiring Repairs
in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 17 | Go to Step 14 |
| 14 | Replace the TR switch. This switch is part of the park/neutral position switch. Refer to Park/Neutral Position Switch Replacement
. Did you complete the replacement? |
- | Go to Step 17 | - |
| 15 | Replace the PCM. Refer to Powertrain Control Module (PCM) Replacement
in Engine Controls - 4.3L or Powertrain Control Module (PCM) Replacement
in Engine Controls - 4.8L, 5.3L and 6.0L. Did you complete the replacement? |
- | Go to Step 17 | - |
| 16 | Replace the IPC. Refer to Instrument Panel Cluster (IPC) Replacement in Instrument Panel, Gages and Console. Did you complete the replacement? |
- | Go to Step 17 | Go to Step 2 |
| 17 |
|
- | System OK | Go to Step 2 |