Installation Procedure
WARNING: This page is about a different car, the 2002 Buick Century. However, it is still accessible from the selected car via links, so may be relevant.
- Install the thermostat.
- Install the water outlet.
- Install the water outlet bolts.
Tighten:
Tighten the bolts to 25 N.m (18 ft lbs)
- Install the ECT sensor.
Tighten:
Tighten the sensor to 23 N.m (17 ft lbs)
- Apply 8-12 mm (0.08-0.11 in) bead of RTV Sealer, GM P/N 12346286 (Canadian P/N 10953472), or equivalent, on each ridge where front and rear of the lower intake manifold contact the engine block (1).
- Install the lower intake manifold gaskets.NOTE: When replacing intake manifold gasket, a revised intake manifold gasket has been introduced by manufacturer. This new design gasket helps resolve issues related to intake manifold oil/coolant leaks. The gasket requires a revised torque specification and procedure in addition to the use of NEW revised intake manifold bolts. Please review TSB ENGINE OIL OR COOLANT LEAK (INSTALL NEW INTAKE MANIFOLD GASKET) for complete information.
- Install the valve rocker arms and pushrods. Refer to Valve Rocker Arm and Push Rod Replacement .
- Install the lower intake manifold.
- Apply sealant, GM P/N 12345382 (Canadian P/N 10953489) to the threads of the bolts.
- Install the lower intake manifold bolts in sequence shown. See Figure.NOTE: An oil leak may result if the vertical bolts are not tightened before the diagonal bolts.
- Install the thermostat bypass hose to the thermostat bypass pipe and lower intake manifold pipe.
- Install the radiator inlet hose to the engine. Refer to RADIATOR HOSE REPLACEMENT - INLET (3.1L) in ENGINE COOLING SYSTEM .
- Install the heater inlet pipe and heater hose to the lower intake manifold.
- Install the power steering pump to the front engine cover. Refer to POWER STEERING PUMP REPLACEMENT (3.1L) .
- Install the fuel injector rail. Refer to FUEL RAIL ASSEMBLY REPLACEMENT in ENGINE CONTROLS - REMOVAL & INSTALLATION, OVERHAUL .
- Install the fuel return pipe to the fuel injector rail. Refer to FUEL HOSE/PIPES REPLACEMENT - FILTER TO ENGINE in ENGINE CONTROLS - REMOVAL & INSTALLATION, OVERHAUL .
- Install the fuel feed pipe to the fuel injector rail. Refer to FUEL HOSE/PIPES REPLACEMENT - FILTER TO ENGINE in ENGINE CONTROLS - REMOVAL & INSTALLATION, OVERHAUL .
- Install the fuel pipe clip.
- Install the fuel pipe clip bolt.
Tighten:
Tighten the bolt to 8 N.m (71 in lbs)
- Install and connect the fuel injector and the MAP sensor wiring harnesses.
- Connect the ECT sensor electrical connector.
- Install the right valve rocker arm cover. Refer to Valve Rocker Arm Cover Replacement - Right .
- Install the left valve rocker arm cover. Refer to Valve Rocker Arm Cover Replacement - Left .
- Install the upper intake manifold. Refer to Intake Manifold Replacement - Upper .
- Connect the negative battery cable.
- Inspect for leaks.