Installation Procedure
- Install the side rail assemblies (1) to the roof and align to the existing Welnuts.
- Install the retainers to the side rails and hand tighten.
- Torque the side rail retainers in this order.
Tighten: Tighten the side rail retainers to 2 N.m (20 lb in).
- Torque the second hole from the front.
- Torque the first hole.
- Torque the third and forth holes.
- Install the front cross rail assembly (2) to the side rails (1), stopping at the second or third notch from the front of each rail.
- Depress the adjuster handles to lock each side.
- Install the rear cross rail to the side rails, stopping at the second or third engagement notch.
- Depress the adjuster handle to lock each side.
- Install the rear rail covers (2) by inserting the legs of the cover and rotating cover down to engage the retainer.
NOTE:
Refer to FASTENER NOTICE
.