Installation Procedure
- Install the front drain valve into the floor.
- Press down on the front drain valve using firm pressure to firmly seat the valve into the floor.
- Install the load floor grate. Refer to Grate Replacement - Load Floor Water Management (Avalanche) .
- Install the compartment covers.
- Close the end gate.