Installation Procedure
- Align the drain valve into the opening in the floor.
- Press down on the drain valve to fully seat the valve into the floor.
- Install the cargo box. Refer to Box Replacement - Cargo Stowage (Avalanche) .
- Install the compartment cover.
- Close the end gate.