LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 1998 >> Jimmy 2D Utility, RWD, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Engine Mechanical - 4.3L V6, 5.0L, 5.7L & 7.4L V8 - VINS [W,X,M,R,J] >> Removal & Installation >> Cylinder Head >> Installation (7.4L - 1998)

Installation (7.4L - 1998)

Clean gasket surfaces, bolt threads and bolt holes. Position NEW head gasket on cylinder block. Ensure all holes align. Coat NEW head bolt threads with GM Sealant (1052080). Install cylinder head with bolts finger-tight. Tighten head bolts in sequence to specification. in 4 passes. On first pass, tighten all bolts to 30 ft. lbs (40 N.m). On second pass, tighten to 60 ft. lbs. (80 N.m). On the third pass, tighten all long bolts (1, 2, 3, 6, 7, 8, 9, 12, 13, 14, 15 and 16) in sequence to 92 ft. lbs. (125 N.m). On the final pass, tighten all short bolts (4, 5, 10 and 11) in sequence to 89 ft. lbs. (120 N.m). See Fig 1. Lubricate the valve tip, rocker arm pivot and push rod socket with a high viscosity oil containing Zinc (1052367) or equivalent. To complete cylinder head installation, reverse removal procedure. Adjust the valves. See VALVE CLEARANCE ADJUSTMENT  under ADJUSTMENTS.

Fig 1: Cylinder Head Bolt Tightening Sequence (7.4L - Left Head Shown; Right Head Is A Mirror Image)
G95D27055Courtesy of GENERAL MOTORS CORP.