Installation (7.4L - 1999)
Clean gasket surfaces and bolt holes. Position NEW head gasket on cylinder block. Ensure all holes align. Coat NEW head bolt threads with GM Sealant (1052080). Install cylinder head with bolts finger-tight. Tighten head bolts in sequence to specification. in 4 passes. On first pass, tighten all bolts to 37 ft. lbs (50 N.m). On second pass, tighten bolts No. 1, 2, 3, 6, 7, 8, 9, 12, 14 and 15 an additional 150 degrees. On the third pass, tighten bolts No. 13 and 16 an additional 150 degrees. On the final pass, tighten bolts 4, 5, 10 and 11 an additional 90 degrees. See Figure. Lubricate the valve tip, rocker arm pivot and push rod socket with a high viscosity oil containing Zinc (1052367) or equivalent. To complete cylinder head installation, reverse removal procedure. Adjust the valves. See VALVE CLEARANCE ADJUSTMENT under ADJUSTMENTS.