Test NTC-2A - Checking Secondary Ignition & Timing
WARNING: This page is about a different car, the 1995 Dodge Ram Wagon, 1995 Dodge Ram Van, 1995 Dodge Pickup, and 1995 Dodge Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
- Turn engine off. Connect engine analyzer to engine. Start engine, and let it idle. If engine will not idle, maintain a constant RPM above idle. Set scope to read display or parade pattern. Follow equipment manufacturer's procedure for pattern analysis.
- If secondary ignition pattern is not okay, repair indicated component in secondary ignition system. Perform TEST VER-2. If secondary ignition pattern is okay, disconnect any spark plug wire. Observe secondary kilovolt line.
- If open circuit secondary voltage is not at least 25 kilovolts, replace electronic ignition coil. Perform TEST VER-2. If open circuit secondary voltage is at least 25 kilovolts, reinstall spark plug wire.
- Ensure engine temperature is more than 180°F (82°C) before proceeding. Using DRB, read total spark advance. Increase engine speed to 2000 RPM. If spark advance does not change with increase in RPM, replace Powertrain Control Module (PCM). Perform TEST VER-2. If spark advance changes with increase in RPM, ignition timing is functioning properly. Test is complete.