LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 1991 >> Value Van 7.4 N >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 5.0L V8 - VIN [H] >> Removal & Installation >> Oil Pan >> Installation

Oil Pan: Installation

  1. Apply sealant GM P/N 1052080 (or equivalent) to the front cover-to-block joint and to the rear crankshaft seal-to-block joint. Apply the sealant from about 25 mm (1 inch) in both directions from each of the four corners.
  2. Install the oil pan bolts, nuts, and reinforcements. Tighten the oil pan bolts to 11 N.m (100 in.lbs.) and the oil pan nuts to 22 N.m (200 in. lb.). Install the starter. Install the flywheel/ torque converter cover.
  3. Connect the oil cooler lines, then lower the vehicle. Fill the crankcase with the proper quantity and grade of engine oil. Connect the negative battery cable.