LEMON Manuals: Even more car manuals for everyone
Home >> Freightliner >> 2007 >> Sprinter 2500 V6-3.0L DSL Turbo >> Repair and Diagnosis >> Powertrain Management >> Fuel Delivery and Air Induction >> Turbocharger >> Turbocharger Vane Actuator >> Service and Repair >> Installation

Installation






INSTALLATION




1. Install actuator rod onto boost pressure positioner (4).
2. Install circlip (1).
3. Position boost pressure positioner and actuator rod onto turbocharger (5).
4. Install mounting bolts (3). Tighten bolts to 8 Nm (70 lbs.in).
5. Install circlip on the actuator rod at the turbocharger end (2).
6. Connect electrical connector (6).
7. Install the turbo heat shield.
8. Connect negative battery cable.
9. Install air cleaner housing.
10. Connect negative battery cable.