Pinpoint Test E : DTC P0620, P065B
WARNING: This page is about a different car, the 2019 Ford F-550 Super Duty, 2019 Ford F-450 Super Duty, 2019 Ford F-350 Super Duty, and 2019 Ford F-250 Super Duty. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
Make sure battery voltage is greater than 12.2 volts prior to and during this pinpoint test.
NOTE:
Do not have a battery charger attached during vehicle testing.
- E1 PERFORM INSPECTION AND VERIFICATION
- Perform Inspection and Verification procedure in this information.
Was an obvious cause for an observed or reported concern found?
Yes CORRECT the cause as necessary. No GO to E2 - E2 CHECK THE GENERATOR CONNECTIONS
- Ignition OFF.
- Disconnect all of the generator connectors and inspect for:
- corrosion (install new connector or terminals - clean module pins)
- damaged or bent pins - install new terminals/pins
- pushed-out pins - install new pins as necessary
- Reconnect the generator connectors. Make sure they seat and latch correctly.
- Measure:
Positive Lead Measurement / Action Negative Lead Refer to C102B-1 Ground
Is the voltage within 0.5 volt of the recorded battery voltage?
Yes GO to E3 No TIGHTEN or INSTALL a new generator B+ nut as needed. REFER to: Generator - 6.2L V8 . REFER to: Generator - 6.8L Triton-30V - V10 . VERIFY high current BJB fuse 2 (275A) is OK. If OK, REPAIR the circuit. If not OK, REFER to OEM Electrical Wiring Diagram Introduction to identify the possible causes of the circuit short. - E3 CHECK THE VOLTAGE DROP IN THE GENERATOR B+ CIRCUIT
- Start the engine.
- With the engine running at idle, headlamps on and blower on high, measure:
Positive Lead Measurement / Action Negative Lead Refer to C102B-1
- Perform a wiggle test of the generator wiring and connections while measuring voltage drop.
Is the voltage drop less than 0.5 volt?
Yes GO to E4 No INSPECT and REPAIR any corrosion in the generator B+ circuit and positive battery cable connections. - E4 "A" SENSE CIRCUIT LOAD TESTNOTE: The following step uses a test light to simulate normal circuit loads. Use only the test light recommended in the Special Tools table at the beginning of this information. To avoid connector terminal damage, use the Flex Probe Kit for the test light probe connection to the vehicle. Do not use the test light probe directly on any connector.NOTE: This step puts a load on the "A" sense circuit. If there are corroded or loose connections, loading the circuit may help show the fault. A 250-350 mA incandescent 12 volt test lamp is required for this step. This circuit cannot be loaded correctly using an LED-style test lamp.
- Ignition OFF.
- Disconnect Generator C102A.
- Ignition ON.
- Install a test lamp between:
Positive Lead Measurement / Action Negative Lead Refer to C102A-3 Ground
- Perform a wiggle test on the generator wiring and measure:
Positive Lead Measurement / Action Negative Lead Refer to C102A-3 Ground
Is the "A" sense voltage within +/-0.5 volt of the recorded battery voltage?
Yes GO to E5 No VERIFY the high current BJB fuse 98 (10A) is OK. If OK, REPAIR the circuit. If not OK, REFER to OEM Electrical Wiring Diagram Introduction to identify the possible causes of the circuit short. - E5 CHECK THE GENERATOR COMMAND CIRCUIT FOR A SHORT TO VOLTAGE
- Ignition OFF.
- Disconnect PCM C175B.
- Ignition ON.
- Perform a wiggle test on the generator wiring and measure:
Positive Lead Measurement / Action Negative Lead Refer to C102A-2 Ground
Is any voltage present?
Yes REPAIR the circuit. No GO to E6 - E6 CHECK THE GENERATOR COMMAND CIRCUIT FOR A SHORT TO GROUND
- Ignition OFF.
- Ignition ON.
- Perform a wiggle test on the generator wiring and measure:
Positive Lead Measurement / Action Negative Lead Refer to C102A-2 Ground
Is the resistance greater than 10, 000 ohms?
Yes GO to E7 No REPAIR the circuit. - E7 CHECK THE GENERATOR COMMAND CIRCUIT FOR AN OPEN
- Perform a wiggle test on the generator wiring and measure:
Positive Lead Measurement / Action Negative Lead Refer to C175B-13 Refer to C102A-2
Is the resistance less than 3 ohms?
Yes GO to E8 No REPAIR the circuit. - Perform a wiggle test on the generator wiring and measure:
- E8 COMPARE THE GENERATOR MONITOR (GENMON) AND GENERATOR COMMAND (GENCMD) PARAMETER IDENTIFICATIONS (PIDS)
- Ignition OFF.
- Connect PCM C175B.
- Connect a fused jumper wire:
Positive Lead Measurement / Action Negative Lead Refer to C102A-1 Refer to C102A-2
- Start the engine.
- Using a diagnostic scan tool, view PCM Parameter Identifications (PIDs).
- Monitor the PCM Parameter Identifications (PIDs) GENMON and GENCMD.
- Perform a wiggle test of the generator wiring and connections.
Do the Parameter Identifications (PIDs) read within 5% of each other?
Yes REMOVE the fused jumper wire. INSTALL a new generator. REFER to: Generator - 6.2L V8 . REFER to: Generator - 6.8L Triton-30V - V10 . No REMOVE the fused jumper wire. GO to E9 - E9 CHECK FOR CORRECT PCM (POWERTRAIN CONTROL MODULE) OPERATION
- Ignition OFF.
- Disconnect and inspect all PCM connectors.
- Repair:
- corrosion (install new connector or terminals - clean module pins)
- damaged or bent pins - install new terminals/pins
- pushed-out pins - install new pins as necessary
- Connect all connectors. Make sure they seat and latch correctly.
- Operate the system and determine if the concern is still present.
Is the concern still present?
Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for this concern, DISCONTINUE this test and FOLLOW the TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, Refer to PCM GUIDED ROUTINE TESTING No The system is operating correctly at this time. The concern may have been caused by module connections. ADDRESS the root cause of any connector or pin issues.