LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2019 >> Edge ST >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Fuel Charging And Controls - Turbocharger - 2.7L ECOBOOST (238KW/324PS) >> Removal And Installation >> Turbocharger Coolant Supply Tube RH >> Installation

Turbocharger Coolant Supply Tube RH: Installation

  1. Install a new turbocharger coolant return tube O-ring seal. Lubricate the new O-ring seal with clean engine coolant. Refer to: Specifications
    GFD382880Courtesy of FORD MOTOR COMPANY
  2. NOTE: Do not use a metal brush, damage to sealing area will result in leaks.

    • Carefully use a nylon brush to remove the old O-ring residue and use brake cleaner to rinse the O-ring residue out of the turbocharger O-ring bore. Inspect the area for deep scratches and gouges. Install new components as needed.

    1. Install the turbocharger coolant supply tube to the turbocharger, then install and tighten the turbocharger coolant supply tube bolt.

      Material: Motorcraft® Metal Brake Parts Cleaner / PM-4-A, PM-4-B

      Torque: 89 lb.in (10 Nm)

    GFD382881Courtesy of FORD MOTOR COMPANY
  3. Install the turbocharger RH. Refer to: Turbocharger RH  )