LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2019 >> Edge ST >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Fuel Charging And Controls - Turbocharger - 2.7L ECOBOOST (238KW/324PS) >> Removal And Installation >> Turbocharger Coolant Supply Tube LH >> Installation

Turbocharger Coolant Supply Tube LH: Installation

  1. Install a new turbocharger coolant supply tube O-ring seal. Lubricate the new O-ring seal with clean engine coolant. Refer to: Specifications
    GFD382880Courtesy of FORD MOTOR COMPANY
  2. NOTE: Do not use a metal brush, damage to sealing area will result in leaks.

    • Carefully use a nylon brush to remove the old O-ring residue and use brake cleaner to rinse the O-ring residue out of the turbocharger O-ring bore. Inspect the area for deep scratches and gouges. Install new components as needed.

      Material: Motorcraft® Metal Brake Parts Cleaner / PM-4-A, PM-4-B

    1. Install the turbocharger coolant supply tube, then install and tighten the turbocharger coolant supply tube bolt.

      Torque: 89 lb.in (10 Nm)

    GFD382878Courtesy of FORD MOTOR COMPANY
  3. Install the Turbocharger LH. Refer to: Turbocharger LH