Pinpoint Test F : B1310:12
- F1 CHECK THE BJB (BATTERY JUNCTION BOX) RUN/START RELAY
- Ignition OFF.
- Disconnect BJB Run/Start Relay.
- Carry out the appropriate relay component test. Refer to Component Testing for schematic and connector information.
Is the relay OK?
Yes GO to F2 No INSTALL a new BJB run/start relay. - F2 CHECK THE RUN/START RELAY CONTROL CIRCUIT FOR A SHORT TO VOLTAGE
Is any voltage present?
Yes REPAIR the circuit. No GO to F3 - F3 CHECK FOR CORRECT BCM (BODY CONTROL MODULE) OPERATION
- Disconnect and inspect all BCM connectors.
- Repair:
- corrosion (install new connector or terminals - clean module pins)
- damaged or bent pins - install new terminals/pins
- pushed-out pins - install new pins as necessary
- Reconnect the BCM connectors and all other previously disconnected connectors. Make sure they seat and latch correctly.
- Operate the system and determine if the concern is still present.
Is the concern still present?
Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for this concern, DISCONTINUE this test and FOLLOW TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, Refer to BCM Hardware Testing -- Fusion (Except Hybrid) No The system is operating correctly at this time. The concern may have been caused by module connections. ADDRESS the root cause of any connector or pin issues.