Valve Clearance Adjustment
Special Tool(s) / General Equipment
| 303-1604Timing Peg, Crankshaft TDC | |
|---|---|
| 303-1605Alignment Tool, Camshaft | |
| Feeler Gauge |
Materials
| Name | Specification |
|---|---|
| Engine Oil - SAE 5W-20 | WSS-M2C948-B |
| Motorcraft ® Gasket MakerTA-16 | WSK-M2G348-A5 |
Check
- 1.
Remove the valve cover. Refer to: Valve Cover .
- 2.NOTE: Only rotate the crankshaft clockwise.
Rotate the crankshaft until the corresponding piston is at TDC and then measure the valve clearance(s). Use the General Equipment: Feeler Gauge
- 4.
Compare the measured valve clearance(s) with the specifications. Refer to: Specifications .
Adjustment
- 2.
Remove the VCT unit. Refer to: Variable Camshaft Timing (VCT) Unit .
- 5.NOTE: Note the position of the components before removal.
Loosen the camshaft bearing caps in sequence, 2 turns at a time until all tension is released from the camshaft bearing caps and remove the bolts, caps and camshafts.
- 6.
- Remove the valve tappet and read the thickness from the underside.
- The number on the valve tappet indicates the thickness of the bottom of the tappet. However, the number only indicates the digits after the decimal point (example: 725 = 2.725).
- 7.
- Calculate the required thickness of the valve tappet with the following formula: X = S + M - V
- Required thickness of tappet = X
- Thickness of currently fitted tappet = S
- Measurement of existing valve clearance (actual value) = M
- Desired valve clearance = V
- 9.NOTE: Make sure that the components are installed to the position noted before removal.
Lubricate and install the camshafts approximately at valve overlap position cylinder No. 1.
Material: Engine Oil - SAE 5W-20 (WSS-M2C948-B)
- 10.
Lubricate the camshaft journals and camshaft bearing caps and install.Material: Engine Oil - SAE 5W-20 (WSS-M2C948-B)
- 11.NOTE: Install all the bolts finger tight before final tightening.
Tighten each bolt 2 turns at a time.
- 13.
- 1.
Turn the camshafts to measure the valve clearance.
- 2.
Measure the valve clearances and repeat this procedure as necessary until all valve clearances are within the specified tolerance.
- 1.
- 14.NOTE: Note the position of the components before removal.
Loosen the camshaft bearing caps in sequence, 2 turns at a time until all tension is released from the camshaft bearing caps and remove the bolts, caps and camshafts.
- 15.NOTE: Make sure that the mating faces are clean and free of foreign material.NOTE: The component must be installed within 5 minutes of applying the sealant.
Apply 3 mm (0.118 in) beads of gasket maker to the intake rear camshaft bearing cap mating surface as shown below.
Material: Motorcraft ® Gasket Maker / TA-16 (WSK-M2G348-A5)
- 16.NOTE: Make sure that the mating faces are clean and free of foreign material.NOTE: The component must be installed within 5 minutes of applying the sealant.
Apply 3 mm (0.118 in) beads of gasket maker to the exhaust rear camshaft bearing cap mating surface as shown below.
Material: Motorcraft ® Gasket Maker / TA-16 (WSK-M2G348-A5)
- 17.NOTE: Make sure that the components are installed to the position noted before removal.
Lubricate and install the camshafts approximately at valve overlap position cylinder No. 1.
Material: Engine Oil - SAE 5W-20 (WSS-M2C948-B)
- 18.
Lubricate the camshaft journals and camshaft bearing caps and install.Material: Engine Oil - SAE 5W-20 (WSS-M2C948-B)
- 19.NOTE: Install all the bolts finger tight before final tightening.
Tighten each bolt 2 turns at a time.
- 21.
- 1.
Install Special Service Tool: 303-1605 Alignment Tool, Camshaft.
- 2.NOTE: Only tighten the bolts finger tight at this stage.
- 3.
Torque: 89 lb.in (10 Nm)
- 1.
- 23.NOTE: Only rotate the crankshaft clockwise.
Rotate the crankshaft slowly until the crankshaft stops.
- 25.
Install the VCT unit. Refer to: Variable Camshaft Timing (VCT) Unit .