Component Description: LTM
The BCM supplies battery logic power required for the software and internal switching operations. The BJB supplies the higher current power needed for the motor and latch operation. If the LTM loses power or is disconnected, the power liftgate initialization procedure must be carried out.
The LTM controls the opening and closing of the power liftgate based on the inputs it receives. Based on the inputs, it determines if conditions allow a power open or power close.
If the LTM is replaced, the power liftgate initialization procedure must be carried out. The LTM does not require PMI when replaced.