Wastegate Control Valve Solenoid: Installation
- 1.
Install the wastegate control valve solenoid, then install and tighten the wastegate control valve solenoid retainers. Torque: 89 lb.in (10 Nm)
- 2.
Connect the wastegate control valve solenoid hoses and the wastegate control valve solenoid electrical connector. Use the General Equipment: Hose Clamp Remover/Installer
- 4.
Install the Powertrain Control Module (PCM). Refer to: Powertrain Control Module (PCM) .