Hardwired Inputs
The IPC requires hardwired inputs from components that are not on the HS-CAN or the MS-CAN. These components are required for specific IPC functions or gateway requirements. REFER to: Module Controlled Functions - System Operation and Component Description .
The hardwired inputs are provided by:
- Park detect switch (part of the floor shifter assembly)
- Upper LH (message center) and upper RH (audio control) steering wheel switch