Pinpoint Test J: B1310:12: B1310:12
- J1 CHECK THE BJB (BATTERY JUNCTION BOX) RUN/START RELAY
- Ignition OFF.
- Remove the BJB run/start relay.
- Carry out the appropriate relay component test.
Refer to OEM WIRING DIAGRAMS COMPONENT TESTING -- (EXCEPT HYBRID) for additional information.
Is the relay OK?
- Yes : GO to J2
- No : INSTALL a new BJB run/start relay.
- J2 CHECK THE RUN/START RELAY CONTROL CIRCUIT FOR A SHORT TO VOLTAGE
Is any voltage present?
- Yes : REPAIR the circuit.
- No : GO to J3
- J3 CHECK FOR CORRECT BCM (BODY CONTROL MODULE) OPERATION
- Disconnect and inspect all BCM connectors.
- Repair:
- corrosion (install new connector or terminals - clean module pins)
- damaged or bent pins - install new terminals/pins
- pushed-out pins - install new pins as necessary
- Reconnect the BCM connectors and all other previously disconnected connectors. Make sure they seat and latch correctly.
- Operate the system and determine if the concern is still present.
Is the concern still present?
- Yes
: CHECK OASIS
for any applicable Technical Service Bulletins (TSBs). If a TSB
exists for this concern, DISCONTINUE this test and FOLLOW TSB
instructions. If no Technical Service Bulletins (TSBs) address this concern, INSTALL a new REFER to: BODY CONTROL MODULE (BCM)
.
BCM .
- No : The system is operating correctly at this time. The concern may have been caused by module connections. ADDRESS the root cause of any connector or pin issues.