System Operation: Startup-Shutdown
The IPC provides a startup-shutdown sequence also known as a welcome-farewell strategy. When the BCM receives an RKE request or a door ajar (open) message, the IPC illuminates the RH and LH turn indicators briefly then illuminates the message center display (base IPC) or displays the message center splash screen (optional IPC). When the ignition is placed in RUN or START, the message center proves out and defaults to normal operation. The IPC illuminates all LED indicators for a predetermined time (prove-out).