LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2012 >> Mustang Base, 2D Coupe, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 515 (OEM Wiring Diagrams Component Testing) >> Component Testing >> Overhead Console Switch Assembly - Roof Opening Panel Control Switch >> Component Testing Procedure - Roof Opening Panel Control Switch

Component Testing Procedure - Roof Opening Panel Control Switch

WARNING: This page is about a different car, the 2014 Ford F-150. However, it is still accessible from the selected car via links, so may be relevant.
Circuit to test Connect self-powered test light or ohmmeter to terminals Move switch to these positions A good switch will indicate
Tilt circuit 12 and 3 Pull Tilt (UP) Closed circuit
12 and 8
12 and 3 Press Tilt (DOWN) Closed circuit
12 and 6
Slide circuit 12 and 8 Pull Slide (UP) Closed circuit
12 and 6 Press Slide (DOWN) Closed circuit