The ignition switch receives fused battery voltage from Smart Junction Box (SJB) fuse 27 (20A) along circuit SPB27 (BU/RD), this voltage is then sent to the SJB and the Battery Junction Box (BJB) for various systems depending on the ignition switch position. The ignition switch has 4 possible positions:
- OFF, voltage is sent to the SJB for the key-in ignition system. Refer to INSTRUMENTATION, MESSAGE CENTER, AND WARNING CHIMES to diagnose any key-in ignition concerns.
- ACC, voltage is sent to the SJB run/accessory bus along circuit CDC33 (VT/GN).
- RUN, voltage is sent along circuit CE612 (GY/VT) to the:
- SJB run/start bus
- SJB internal microprocessor
- start diode
- BJB fuse 39 (5A)
- BJB fuse 45 (5A)
- START, voltage is sent to the SJB start bus along circuit CDC35 (BU/WH).
This pinpoint test is intended to diagnose the following:
- Fuse(s)
- Wiring, terminals or connectors
- Ignition switch
- SJB