LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2012 >> Mustang Base, 2D Coupe, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 365 (Engine Cooling System (Gas)) >> Removal And Installation >> Thermostat >> 6.8L Engine >> Removal and Installation

Removal and Installation

WARNING: This page is about a different car, the 2013 Ford F-550 Super Duty, 2013 Ford F-450 Super Duty, 2013 Ford F-350 Super Duty, and 2013 Ford F-250 Super Duty. However, it is still accessible from the selected car via links, so may be relevant.
  1. Drain the engine cooling system. For additional information, refer to COOLING SYSTEM DRAINING, FILLING AND BLEEDING .
  2. Remove the Air Cleaner (ACL) outlet pipe. For additional information, refer to INTAKE AIR DISTRIBUTION & FILTERING .
  3. If servicing the coolant outlet connection, disconnect the upper radiator hose from the coolant outlet connection.
  4. Remove the 2 bolts, position the coolant outlet connection aside and remove the thermostat. Discard the O-ring seal.
    • Inspect the mating surfaces and clean the sealing surfaces with metal surface prep and silicone gasket remover. Follow the directions on the packaging.
    • If necessary, install a new thermostat.
    • Install a new O-ring seal.
    • NOTE: Make sure the coolant outlet connection is seated evenly by hand tightening the 2 thermostat housing bolts prior to final tightening.

      To install, tighten to 10 Nm (89 lb-in).

  5. To install, reverse the removal procedure.
  6. Fill and bleed the cooling system. For additional information, refer to COOLING SYSTEM DRAINING, FILLING AND BLEEDING .