Engine Front Cover: Installation
WARNING: This page is about a different car, the 2013 Ford Explorer. However, it is still accessible from the selected car via links, so may be relevant.
-
NOTE: Only use a 3M Roloc® Bristle Disk (2-in white, part number 07528) to clean the engine front cover. Do not use metal scrapers, wire brushes or any other power abrasive disk to clean front cover.
Clean the engine front cover using a 3M Roloc® Bristle Disk (2-in white, part number 07528) in a suitable tool turning at the recommended speed of 15,000 rpm. Thoroughly wash the engine front cover to remove any foreign material, including any abrasive particles created during the cleaning process.
-
NOTE: Place clean, lint-free shop towels over exposed engine cavities. Carefully remove the towels so foreign material is not dropped into the engine. Any foreign material (including any material created while cleaning gasket surfaces) that enters the oil passages or the oil pan, may cause engine failure.NOTE: Do not use wire brushes, power abrasive discs or 3M Roloc® Bristle Disk (2-in white part number 07528) to clean the sealing surfaces of engine block, cylinder heads, and oil pan. These tools can cause contamination that will cause premature engine failure. Remove all traces of the gasket.
Clean the sealing surfaces of the cylinder heads, the cylinder block and the oil pan in the following sequence.
- Remove any large deposits of silicone or gasket material.
- Apply Motorcraft® Silicone Gasket Remover and allow to set for several minutes.
- Remove the Motorcraft® Silicone Gasket Remover. A second application of Motorcraft® Silicone Gasket Remover may be required if residual traces of silicone or gasket material remain.
- Apply Motorcraft® Metal Surface Prep to remove any remaining traces of oil or coolant and to prepare the surfaces to bond. Do not attempt to make the metal shiny. Some staining of the metal surfaces is normal.
-
NOTE: Make sure the 2 locating dowel pins are seated correctly in the cylinder block.
Install 307-399.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: The engine front cover and bolts 7, 8, 15, 17, 18, 21 and 22 must be installed within 4 minutes of the initial sealant application. The remainder of the engine front cover bolts must be installed and tightened within 35 minutes of the initial sealant application. If the time limits are exceeded, the sealant must be removed, the sealing area cleaned and sealant reapplied. To clean the sealing area, use Motorcraft® Silicone Gasket Remover and Motorcraft® Metal Surface Prep. Failure to follow this procedure can cause future oil leakage.
Apply a 3 mm (0.1181 in) bead of Motorcraft® High Performance Engine RTV Silicone to the sealing surface of the front cover.
-
NOTE: Make sure the 2 locating dowel pins are seated correctly in the cylinder block.
Install the engine front cover and bolts 7, 8, 15, 17, 18, 21 and 22.
- Remove 307-399.
- Install the M6 engine front cover bolt.
- Install the 2 upper M10 engine front cover bolts.
-
NOTE: It may be necessary to use the floor jack and lower the engine slightly to gain enough access to install the bolt.
Install the lower M10 bolt. Do not tighten at this time.
- Install the remaining engine front cover bolts. Tighten all of the engine front cover bolts in the sequence shown in illustration in 7 stages.
- Stage 1: Tighten bolts 1 thru 22 to 10 Nm (89 lb-in).
- Stage 2: Tighten bolts 23 thru 25 to 15 Nm (133 lb-in).
- Stage 3: Tighten bolt 26 to 10 Nm (89 lb-in).
- Stage 4: Loosen bolt 26 one full turn.
- Stage 5: Tighten bolts 23 thru 25 to 30 Nm (22 lb-ft) plus an additional 90 degrees.
- Stage 6: Tighten bolts 1 thru 22 to 20 Nm (177 lb-in) plus an additional 45 degrees.
- Stage 7: Tighten bolt 26 to 10 Nm (89 lb-in) plus an additional 45 degrees.
- Install the engine mount, 4 engine mount nuts and 3 engine mount bolts hand tight.
- Position the generator and install the stud and nut.
- Install the LH and RH valve covers. Refer to VALVE COVER - LH and Refer to VALVE COVER - RH .
- Install the fuel tube-to-engine front cover bolt.
- Tighten the bolt to 10 Nm (89 lb-in).
- Connect the fuel supply tube to the fuel rail supply tube. REFER to
QUICK CONNECT COUPLING
.
- Using a new O-ring seal, connect the A/C pressure tube fitting and install the nut.
- Connect the degas bottle coolant hose to the engine coolant tube.
- Install degas bottle. REFER to DEGAS BOTTLE .
- If equipped, attach the engine block heater harness to the radiator support, the A/C suction tube and the engine wiring harness.
- Install the accessory drive belt tensioner. REFER to ACCESSORY DRIVE BELT TENSIONER - 3.5L TI-VCT, 3.7L TI-VCT .
- Install the crankshaft front seal. Refer to CRANKSHAFT FRONT SEAL .
- Install the underbody air duct and the 3 twist lock retainers.
- Install the RH fender splash shield. REFER to FENDER SPLASH SHIELD .
- Fill the engine with clean engine oil.
- Fill the cooling system. REFER to COOLING SYSTEM DRAINING, FILLING AND BLEEDING .
- Connect the battery ground cable. REFER to BATTERY DISCONNECT for connection procedure.
- Evacuate and recharge the A/C system. REFER to AIR CONDITIONING (A/C) SYSTEM RECOVERY, EVACUATION AND CHARGING .