Lower Engine Block (View 2)
| Item | Part Number | Description |
|---|---|---|
| 1 | - | Piston compression upper ring (part of 6148) (6 required) |
| 2 | - | Piston compression lower ring (part of 6148) (6 required) |
| 3 | - | Piston oil control upper segment ring (part of 6148) (6 required) |
| 4 | - | Piston oil control spacer (part of 6148) (6 required) |
| 5 | - | Piston oil control lower segment ring (part of 6148) (6 required) |
| 6 | 6140 | Piston pin retainer (12 required) |
| 7 | 6135 | Piston pin (6 required) |
| 8 | 6110 | Piston (6 required) |
| 9 | 6200 | Connecting rod (6 required) |
| 10 | 6211 | Connecting rod upper bearing (6 required) |
| 11 | 6211 | Connecting rod lower bearing (6 required) |
| 12 | - | Connecting rod cap (part of 6200) (6 required) |
| 13 | 6010 | Cylinder block |
| 14 | 6K868 | Piston oil cool valve (6 required) |
| 15 | 6333 | Cylinder block crankshaft main bearing (4 required) |
| 16 | 6A341 | Crankshaft upper thrust washer (2 required) |
| 17 | 6303 | Crankshaft |
| 18 | 6A338 | Lower crankshaft main bearings (4 required) |
| 19 | 6K302 | Crankshaft lower thrust washer |
| 20 | - | Lower crankshaft main bearing caps (part of 6010) (4 required) |
| 21 | 6C364 | Main bearing cap support brace |
All vehicles
-
NOTE: This procedure is for selecting bearings using a new crankshaft.
Select the crankshaft main bearings for each crankshaft journal.
- Read the code on the crankshaft flange.
- Read the code on the cylinder block face.
- Install the 6 piston oil cool valves.
-
NOTE: This chart is for selecting main bearings 1 and 4 only, the remaining bearings will be selected using a different chart in the next step.
Using the data recorded earlier and the Bearing Select Fit Chart, Standard Bearings, determine the required bearing grade for main bearings 1 and 4.
- Read the first letter of the engine block main bearing code and the first letter of the crankshaft main bearing code.
- Read down the column below the engine block main bearing code letter and across the row next to the crankshaft main bearing code letter, until the 2 intersect. This is the required bearing grade(s) for the No. 1 crankshaft main bearing.
- As an example, if the engine block code letter is "F" and the crankshaft code letter is "P", the correct bearing grade for this main bearing is a "1" for the upper bearing and a "2" for the lower bearing.
- Repeat the above steps using the fourth letter of the block and crankshaft codes to select the No. 4 bearing.
-
NOTE: This chart is for selecting main bearings 2 and 3 only.
Using the data recorded earlier and the Bearing Select Fit Chart, Standard Bearings, determine the required bearing grade for main bearings 2 and 3.
- Read the second letter of the engine block main bearing code and the second letter of the crankshaft main bearing code.
- Read down the column below the engine block main bearing code letter and across the row next to the crankshaft main bearing code letter, until the 2 intersect. This is the required bearing grade for the No. 2 crankshaft main bearing.
- As an example, if the engine block code letter is "F" and the crankshaft code letter is "P", the correct bearing grade for this main bearing is "1".
- Repeat the above steps using the third letter of the block and crankshaft codes to select the No. 3.
-
NOTE: The rod cap installation must keep the same orientation as marked during disassembly or engine damage may occur.
Using the original connecting rod cap bolts, install the connecting rod caps and bolts.
- Measure the connecting rod large end bore in 2 directions.
- Measure each of the crankshaft connecting rod bearing journal diameters in at least 2 directions.
- Using the chart, select the correct connecting rod bearings for each crankshaft connecting rod journal.
-
NOTE: Before assembling the cylinder block, all sealing surfaces must be free of chips, dirt, paint and foreign material. Also, make sure the coolant and oil passages are clear.
Lubricate and install the 4 crankshaft main bearings in the cylinder block.
-
NOTE: Do not install the upper thrust bearings until the crankshaft is installed.NOTE: Lubricate the thrust surfaces of the crankshaft with clean engine oil.
Install the crankshaft onto the upper main bearings.
-
NOTE: Make sure the side of the thrust washer, with the wide oil grooves, faces the crankshaft thrust surface.
Push the crankshaft rearward and install the rear crankshaft upper thrust washer at the back of the No. 4 rear bulkhead.
-
NOTE: Make sure the side of the thrust washer, with the wide oil grooves, faces the crankshaft thrust surface.
Push the crankshaft forward and install the front crankshaft upper thrust washer at the front of the No. 4 rear bulkhead.
- Lubricate and install the main bearing caps. Visually check seating and squareness of the bearings to make sure of proper seating in caps.
- Position the No. 1, No. 2 and No. 3 main bearing caps on the cylinder block and, keeping the caps as square as possible, alternately draw the caps down evenly using the new bolts until the main bearing caps are seated.
-
NOTE: Make sure the side of the thrust washer, with the wide oil grooves, faces the crankshaft thrust surface.NOTE: To aid in assembly, apply petroleum jelly to the back of the crankshaft thrust washer.
Install the lower crankshaft thrust washer to the back side of the No. 4 rear main bearing cap, with the tab aligned with the cutout in the main bearing cap.
- Position main bearing cap No. 4 on the cylinder block and keeping the cap as square as possible, alternately draw the cap down evenly using the new bolts until the main bearing cap is seated.
-
NOTE: While tightening the main bearing vertical bolts, push the crankshaft forward and the No. 4 main bearing cap rearward to seat the crankshaft thrust washers.
Tighten the main bearing bolts in the sequence shown in illustration in 2 stages.
- Install the new 8 main bearing cap side bolts. Tighten in the sequence shown in illustration in 2 stages.
- Special Tool(s): Dial Indicator Gauge with Holding Fixture 100-002 (TOOL-4201-C). Measure crankshaft end play.
-
NOTE: The rod cap installation must keep the same orientation as marked during disassembly or engine damage may occur.
Prepare the connecting rod and cap.
- Before installing the pistons into the cylinder block, verify proper ring gap location.
-
NOTE: Be sure not to scratch the cylinder wall or crankshaft journal with the connecting rod. Push the piston down until the connecting rod bearing seats on the crankshaft journal.NOTE: The next 3 steps are for all 6 connecting rods, rod caps and pistons. Only 1 connecting rod, rod cap and piston is shown in illustration.NOTE: Lubricate the pistons, piston rings, connecting rod bearings and the entire cylinder bores with clean engine oil.NOTE: Make sure the piston rings are positioned to specifications for installation. Refer to PISTON .NOTE: If the piston and or connecting rod are being installed new, the piston rod orientation marks and the arrow on the top of the dome of the piston should be facing toward the front of the engine block.NOTE: If the piston and connecting rod are to be reinstalled, they must be installed in the same orientation as disassembled.
Install the piston and connecting rod assemblies.
-
NOTE: The rod cap installation must keep the same orientation as marked during disassembly or engine damage may occur.NOTE: After installation of each piston, connecting rod, rod cap and bolts, rotate the crankshaft to verify smooth operation.
Install the connecting rod cap and bolts.
- Repeat the previous 3 steps until all 6 piston, connecting rod and connecting rod cap assemblies are installed.
- Install the main bearing cap support brace and the new bolts. Tighten in the sequence shown in illustration in 2 steps.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: The crankshaft rear seal retainer must be installed and the bolts tightened within 4 minutes of sealant application.NOTE: Cast aluminum (early build) crankshaft rear seal retainer plate shown in illustration, stamped steel (late build) crankshaft rear seal retainer plate is similar.NOTE: The stamped steel (late build) crankshaft rear seal retainer plate comes with the crankshaft rear seal.
Apply a 3 mm (0.11 in) bead of silicone to the sealing surface of the crankshaft rear seal retainer.
Vehicles with cast aluminum (early build) crankshaft rear seal retainer plate
- Install the crankshaft rear seal retainer and the 8 bolts.
Vehicles with stamped steel (late build) crankshaft rear seal retainer plate
- Install the crankshaft rear seal retainer and the 8 bolts.
All vehicles
- Install the oil pump and the 3 bolts.
- Install a new O-ring seal.
- Install the oil pump screen and pickup tube and the 2 bolts.
-
NOTE: The A/C compressor must be installed on the cylinder block and the 2 bolts tightened prior to installing the oil pan for oil pan alignment.
Install the A/C compressor and the 2 stud bolts.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: The oil pan and the 4 specified bolts must be installed and the oil pan aligned to the cylinder block and A/C compressor within 4 minutes of sealant application. Final tightening of the oil pan bolts must be carried out within 60 minutes of sealant application.
Apply a 3 mm (0.11 in) bead of silicone to the sealing surface of the oil pan.
- Apply a 5.5 mm (0.21 in) bead of silicone to the 2 crankshaft seal retainer plate-to-cylinder block joint areas on the sealing surface of the oil pan.
-
NOTE: The oil pan and the 4 specified bolts must be installed within 4 minutes of the start of sealant application.
Install the oil pan and bolts 10, 11, 13 and 14.
- Align the oil pan to the cylinder block and A/C compressor.
- Tighten bolts 10, 11, 13 and 14 in the sequence shown in illustration to 3 Nm (27 lb-in).
- Install the remaining oil pan bolts. Tighten all the oil pan bolts in the sequence shown in illustration.
- Install the A/C compressor stud and nut.
-
NOTE: The A/C compressor stud bolt will be install in installation.
Remove the rear A/C compressor stud bolt.
- Install the coolant pump and the 8 bolts. Tighten in the sequence shown in illustration in 2 stages:
- Install the Knock Sensor (KS) and the 2 bolts.
-
NOTE: Apply clean engine coolant to the O-ring seal prior to installation.
Install the new coolant inlet tube O-ring seal.
- Install the coolant inlet tube.
- Install a new RH cylinder head gasket.
- Install the RH cylinder head and 8 new bolts. Tighten in the sequence shown in illustration in 5 stages:
- Install the M6 bolt.
- Install a new LH cylinder head gasket.
- Install a new gasket, the LH cylinder head and 8 new bolts. Tighten in the sequence shown in illustration in 5 stages:
- Install the M6 bolt.
-
NOTE: The crankshaft must remain in the freewheeling position (crankshaft dowel pin at 9 o'clock) until after the camshafts are installed and the valve clearance is checked/adjusted. Do not turn the crankshaft until instructed to do so. Failure to follow this process will result in severe engine damage.
Position the crankshaft dowel pin in the 9 o'clock position.
-
NOTE: The valve tappets must be installed in their original positions.NOTE: Coat the valve tappets with clean engine oil prior to installation.NOTE: LH shown in illustration, RH similar.
Install the 24 valve tappets.
-
NOTE: The camshafts must remain in the neutral position during installation or engine damage may occur.
Lubricate and position the camshafts onto the RH cylinder head in the neutral position as shown in illustration.
-
NOTE: Cylinder head camshaft bearing caps are numbered to verify that they are assembled in their original positions.
Install the 8 RH camshaft caps and the 16 bolts. Tighten the bolts in the sequence shown in illustration in the following stages:
- Stage 1: Tighten bolts 1, 2, 3 and 4 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 2: Tighten bolts 5 and 6 to 8 Nm (71 lb-in).
- Stage 3: Tighten bolts 7 and 8 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 4: Loosen bolts 5 and 6.
- Tighten bolts 5 and 6 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 5: Tighten bolts 9, 10, 11 and 12 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 6: Tighten bolts 13 and 14 to 8 Nm (71 lb-in).
- Stage 7: Tighten bolts 15 and 16 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 8: Loosen bolts 13 and 14.
-
NOTE: The camshafts must remain in the neutral position during installation or engine damage may occur.
Lubricate and position the camshafts onto the LH cylinder head in the neutral position as shown in illustration.
-
NOTE: Cylinder head camshaft bearing caps are numbered to verify that they are assembled in their original positions.
Install the 8 LH camshaft caps and the 16 bolts. Tighten the bolts in the sequence shown in illustration in the following stages:
- Stage 1: Tighten bolts 1, 2, 3 and 4 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 2: Tighten bolts 5 and 6 to 8 Nm (71 lb-in).
- Stage 3: Tighten bolts 7 and 8 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 4: Loosen bolts 5 and 6.
- Tighten bolts 5 and 6 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 5: Tighten bolts 9, 10, 11 and 12 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 6: Tighten bolts 13 and 14 to 8 Nm (71 lb-in).
- Stage 7: Tighten bolts 15 and 16 to 8 Nm (71 lb-in) then an additional 45 degrees.
- Stage 8: Loosen bolts 13 and 14.
-
NOTE: If any components are installed new, the engine valve clearance must be checked/adjusted or engine damage may occur.NOTE: Use a camshaft sprocket bolt to turn the camshafts.
Confirm that the valve tappet clearances are within specification. Refer to VALVE CLEARANCE CHECK .
- Install the RH timing chain guide and bolt.
- Install the RH secondary timing chain tensioner and the 2 bolts.
-
NOTE: Use a camshaft sprocket bolt to turn the camshafts.
Rotate the RH camshafts to the Top Dead Center (TDC) position.
Install the Special Tool(s): Tool, Camshaft Holding 303-1248.
- Assemble the RH Variable Camshaft Timing (VCT) assembly, the RH exhaust camshaft sprocket and the RH secondary timing chain.
- Position the RH secondary timing assembly onto the camshafts and install the new VCT bolt and the exhaust camshaft bolt and the original washer. Tighten in 4 stages.
- Remove the Lock Pin.
- Install the LH secondary timing chain tensioner and the 2 bolts.
-
NOTE: Use a camshaft sprocket bolt to turn the camshafts.
Rotate the LH camshafts to the TDC position.
Install the Special Tool(s): Tool, Camshaft Holding 303-1248.
- Assemble the LH VCT assembly, the LH exhaust camshaft sprocket and the LH secondary timing chain.
- Position the LH secondary timing assembly onto the camshafts and install the new VCT bolt and the exhaust camshaft bolt and the original washer. Tighten in 4 stages.
- Remove the Lock Pin.
- Rotate the crankshaft clockwise 60 degrees to the TDC position (crankshaft dowel pin at 11 o'clock).
- Install the upper LH primary timing chain guide and the bolt.
- Install the crankshaft timing chain sprocket.
-
NOTE: The crankshaft sprocket timing mark should be between the 2 colored links.
Install the primary timing chain with the colored links aligned with the timing marks on the VCT assemblies and the crankshaft sprocket.
- Install the lower LH primary timing chain guide and the 2 bolts.
- Install the primary timing chain tensioner arm.
- Reset the primary timing chain tensioner.
-
NOTE: It may be necessary to rotate the crankshaft slightly to remove slack from the timing chain and install the tensioner.
Install the primary tensioner and the 2 bolts.
- As a post-check, verify correct alignment of all timing marks.
-
NOTE: RH shown in illustration, LH similar.NOTE: During removal, the O-ring seal may remain on the cylinder head. If so, remove the O-ring seal from the cylinder head, inspect the seal (replace as necessary) and install the O-ring seal on the VCT housing.
Visual check the VCT housing-to-cylinder head O-ring seals and VCT housing seals for damage and replace as necessary.
-
NOTE: Make sure the dowels on the Variable Camshaft Timing (VCT) housing are fully engaged in the cylinder head prior to tightening the bolts. Failure to follow this process will result in severe engine damage.
Install the LH VCT housing and the 3 bolts.
-
NOTE: Make sure the dowels on the Variable Camshaft Timing (VCT) housing are fully engaged in the cylinder head prior to tightening the bolts. Failure to follow this instruction will result in severe engine damage.
Install the RH VCT housing and the 3 bolts.
- Install the Special Tool(s): Alignment Pins 307-399.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: The engine front cover and bolts 17, 18, 19 and 20 must be installed within 4 minutes of the initial sealant application. The remainder of the engine front cover bolts and the engine mount bracket bolts must be installed and tightened within 35 minutes of the initial sealant application. If the time limits are exceeded, the sealant must be removed, the sealing area cleaned and sealant reapplied. To clean the sealing area, use silicone gasket remover and metal surface prep. Failure to follow these instructions can cause future oil leakage.
Apply a 3.0 mm (0.11 in) bead of silicone to the engine front cover sealing surfaces including the 3 engine mount bracket bosses.
-
NOTE: Make sure the 2 locating dowel pins are seated correctly in the cylinder block.
Install the engine front cover and bolts 17, 18, 19 and 20.
- Remove the Special Tool(s): Alignment Pins 307-399.
- Install the engine mount bracket and the 3 bolts.
-
NOTE: Do not expose the Motorcraft® High Performance Engine RTV Silicone to engine oil for at least 90 minutes after installing the engine front cover. Failure to follow this instruction may cause oil leakage.
Install the remaining engine front cover bolts. Tighten all of the engine front cover bolts and engine mount bracket bolts in the sequence shown in illustration in 2 stages:
-
NOTE: Apply clean engine oil to the crankshaft front seal bore in the engine front cover.
Special Tool(s): Installer, Front Crankshaft Seal 303-1251 and Installer, Crankshaft Vibration Damper 303-102 (T74P-6316-B).
Install a new crankshaft front seal.
- Apply clean engine oil to the crankshaft pulley and seal.
- Special Tool(s): Installer, Front Cover Oil Seal 303-335 and Installer, Crankshaft Vibration Damper 303-102 (T74P-6316-B).
Install the crankshaft pulley.
- Install the crankshaft pulley washer and new bolt and tighten in 4 stages.
-
NOTE: VCT solenoid seal installation shown in illustration, spark plug tube seal removal similar.NOTE: Installation of new seals is only required if damaged seals were removed during disassembly of the engine.
Special Tool(s): Installer, VCT Spark Plug Tube Seal 303-1247/2 and Handle 205-153 (T80T-4000-W).
Install new VCT solenoid and/or spark plug tube seals.
- Install the RH valve cover gasket.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: If the valve cover is not installed and the fasteners tightened within 4 minutes, the sealant must be removed and the sealing area cleaned. To clean the sealing area, use silicone gasket remover and metal surface prep. Failure to follow these instructions can cause future oil leakage.
Apply an 8 mm (0.31 in) bead of silicone to the engine front cover-to-RH cylinder head joints.
- Using a new gasket, install the RH valve cover and tighten the 11 stud bolts.
- Install the LH valve cover gasket.
-
NOTE: Failure to use Motorcraft® High Performance Engine RTV Silicone may cause the engine oil to foam excessively and result in serious engine damage.NOTE: If the valve cover is not installed and the fasteners tightened within 4 minutes, the sealant must be removed and the sealing area cleaned. To clean the sealing area, use silicone gasket remover and metal surface prep. Failure to follow these instructions can cause future oil leakage.
Apply an 8 mm (0.31 in) bead of silicone to the engine front cover-to-LH cylinder head joints.
- Using a new gasket, install the LH valve cover and tighten the 10 stud bolts.
- Inspect the 6 ignition coil-on-plug seals for rips, nicks or tears. Remove and discard any damaged ignition coil-on-plug seals.
-
NOTE: Apply a small amount of dielectric grease to the inside of the ignition coil-on-plug boots before attaching to the spark plugs.
Install the 3 LH ignition coil-on-plugs and the 3 bolts.
-
NOTE: Apply a small amount of dielectric grease to the inside of the ignition coil-on-plug boots before attaching to the spark plugs.
Install the 3 RH ignition coil-on-plugs and the 3 bolts.
-
NOTE: A clean working environment is essential to prevent dirt or foreign material contamination.NOTE: Make sure to thoroughly clean any residual fuel or foreign material from the cylinder head, block and the general surrounding area of the fuel rails and injectors.
Special Tool(s): Brush, Fuel Injector 310-205.
Clean the fuel injector orifices.
- Discard the O-ring seal and injector support disc.
-
NOTE: Do not attempt to cut the lower Teflon® seal without first pulling it away from the fuel injector or damage to the injector may occur.NOTE: Be very careful when removing the lower Teflon® seals, not to scratch, nick or gouge the fuel injectors.
Remove the Teflon® seal from the fuel injector.
- Place the Teflon® Seal Sizer, knurled side out, over the fuel injector tip until the fuel injector seal recess is exposed.
-
NOTE: Make sure the Teflon® seal is fully seated in the groove on the fuel injector before sizing the seal.NOTE: Install the fuel injectors into the cylinder head within 15 minutes of sizing the seals due to Teflon® seal expansion.
Special Tool(s): Sizer, Teflon® Seal 303-1567.
-
NOTE: Use fuel injector O-ring seals that are made of special fuel-resistant material. The use of ordinary O-ring seals may cause the fuel system to leak. Do not reuse the O-ring seals.NOTE: Do not lubricate the new lower Teflon® fuel injector seals.NOTE: Make sure that new upper fuel injector O-ring seals, upper fuel injector O-ring seal support rings and fuel injector retainer clips are installed.
Install the O-ring seal, injector support disc and clip.
-
NOTE: LH shown in illustration, RH similar.NOTE: The anti-rotation finger of the fuel injector clip must slip into the groove of the fuel rail cup.NOTE: The fuel rail pressure sensor must be replaced if it is removed from the fuel rail. Refer to FUEL RAIL PRESSURE (FRP) SENSOR -- 3.5L GTDI .
-
NOTE: It is very important to note the routing of the fuel charge wiring harnesses on the fuel rails and index-mark the location of the tie straps prior to removal or damage may occur to the wire harnesses during installation. The illustration details the correct fuel charge wire harness routing and tie strap positioning for installation.
Install the fuel charge wire harnesses and tie straps to the index-marked locations on the fuel rails. Start by attaching the first tie strap farthest down the wire harness and continue to the connector end of the harness, leaving ample slack between the fuel injectors.
-
NOTE: It is very important to visually inspect the routing of the fuel charge wire harness to make sure that they will not be pinched or damaged between the fuel rail and the cylinder head during installation.NOTE: Tighten the bolts in a method that draws the fuel rail evenly to the head, preventing a rocking motion.
Install the 6 new bolts and the RH fuel rail assembly.
-
NOTE: It is very important to visually inspect the routing of the fuel charge wire harness to make sure that they will not be pinched or damaged between the fuel rail and the cylinder head during installation.NOTE: Tighten the bolts in a method that draws the fuel rail evenly to the head, preventing a rocking motion.
Install the 6 new bolts and the LH fuel rail assembly.
-
NOTE: The cam lobe for the fuel injection pump must be at Bottom Dead Center (BDC) for the fuel injection pump installation.
Using the crankshaft pulley bolt, turn the crankshaft until the fuel injection pump cam lobe is at BDC.
-
NOTE: Lubricate the fuel injection pump roller tappet and bore with clean engine oil.
Install the fuel injection pump roller tappet.
-
NOTE: Lubricate the valve cover gasket with clean engine oil.
Inspect the fuel injection pump mounting plate-to-valve cover gasket and replace if necessary.
-
NOTE: Lubricate the O-ring seals with clean engine oil.
Inspect the 2 fuel injection pump mounting plate O-ring seals and replace if necessary.
-
NOTE: Lubricate the O-ring seal with clean engine oil.
Install a new fuel injection pump O-ring seal.
-
NOTE: Make sure the mating surfaces are free of any dirt or foreign material.NOTE: Orient the arrow on the fuel injection pump mounting plate towards the front of the engine.
Install the fuel injection pump mounting plate on the fuel injection pump.
- Install the fuel injection pump, mounting plate and the 2 new bolts finger-tight.
-
NOTE: Apply clean engine oil to the threads of the 3 high-pressure fuel tube flare nuts.NOTE: Calculate the correct torque wrench setting for the following torque. Refer to the Torque Wrench Adapter Formulas.
Install the high-pressure fuel tube and tighten the 3 flare nuts in the following 3 stages.
- Install the RH cylinder block drain plug or if equipped, the block heater.
- Install the LH cylinder block drain plug.
- Install the cover and the pin-type retainer.
- Install the RH engine lifting eye and the 2 bolts.
- Install 8 new RH exhaust manifold studs.
-
NOTE: Failure to tighten the exhaust manifold nuts to specification a second time will cause the exhaust manifold to develop an exhaust leak.
Install a new gasket, RH exhaust manifold and 8 new nuts. Tighten in 2 stages in the sequence shown in illustration:
- Install the upper RH turbocharger-to-cylinder block bracket and the 3 bolts and position the bracket as far clockwise as possible and tighten the bolts in the following sequence:
-
NOTE: Lubricate the O-ring seals with clean engine oil.
Install 2 new O-ring seals and new gasket on the oil return tube.
-
NOTE: Lubricate the cylinder block bore with clean engine oil.
Install the RH turbocharger oil return tube and the 2 bolts.
- Install 2 new sealing washers.
- Install the oil supply tube filter, washer and bolt.
-
NOTE: Make sure the turbocharger wastegate regulating valve hose does not contact the exhaust manifold heat shield.
Install the 2 RH turbocharger coolant tubes, RH turbocharger oil supply tube and the 3 banjo bolts.
- Visual check.
If necessary, replace the quick connect fitting.
-
NOTE: Listen for audible click when installing the oil supply tube into the quick connect fitting.
Install the RH oil supply tube into the quick connect fitting. Refer to QUICK CONNECT COUPLING . Noise check, see illustration.
- Install the RH oil supply tube secondary latch and the HO2S bracket and stud bolt to the engine front cover.
-
NOTE: Make sure the heat shield does not contact the wastegate arm.
Install the 2 upper RH exhaust manifold heat shield and the 5 bolts.
- Install the turbocharger coolant tube assembly and the bolt.
- Install the Crankshaft Position (CKP) sensor and install the bolt.
- Install the wiring harness and the stud bolt and connect the CKP sensor electrical connector.
- Install the wiring harness grommet.
- Install the heat shield and the nut.
- Install new LH exhaust manifold studs and gasket.
-
NOTE: Failure to tighten the exhaust manifold nuts to specification a second time will cause the exhaust manifold to develop an exhaust leak.
Install the LH exhaust manifold and turbocharger assembly and 8 new nuts. Tighten the nuts in 2 stages in the sequence shown in illustration:
- Install the upper turbocharger bracket-to-cylinder block and the 2 bolts.
- Install the lower turbocharger-to-cylinder block bracket and the 2 bolts.
NOTE: The next 4 steps must be performed in order or damage to the turbocharger may occur.
- Tighten the upper turbocharger bracket-to-turbocharger bolt.
- Tighten the upper turbocharger bracket-to-cylinder block bolt.
- Tighten the lower turbocharger bracket-to-turbocharger bolt.
- Tighten the lower turbocharger bracket-to-cylinder block bolt.
-
NOTE: Lubricate the O-ring seals with clean engine oil.
Install 2 new O-ring seals and new gasket on the oil return tube.
-
NOTE: Lubricate the oil pan bore with clean engine oil.
Install the LH turbocharger oil return tube in the oil pan and install the 2 bolts.
- Install 2 new coolant tube sealing washers.
- Install the oil supply tube filter, washer and bolt.
-
NOTE: Make sure the turbocharger wastegate regulating valve hose does not contact the exhaust manifold heat shield.
Install the 2 LH turbocharger coolant tubes, LH turbocharger oil supply tube and banjo bolts.
- Visual check.
If necessary, replace the quick connect fitting.
-
NOTE: Listen for audible click when installing the oil supply tube into the quick connect fitting.
Install the LH oil supply tube into the quick connect fitting. Refer to QUICK CONNECT COUPLING .
Noise check.
- Install the LH oil supply tube secondary latch.
- Install new intake manifold, coolant crossover and thermostat housing gaskets.
-
NOTE: If the engine is repaired or replaced because of upper engine failure, typically including valve or piston damage, check the intake manifold for metal debris. If metal debris is found, install a new intake manifold. Failure to follow these instructions can result in engine damage.NOTE: Make sure the fuel rail wiring harnesses are routed correct.NOTE: Installing the 2 long bolts first will aid in installing the intake manifold.
Install the intake manifold and the 12 bolts. Tighten in the sequence shown in illustration in 2 stages.
- Install LH CMP sensor and the bolt and install the ground wire and the stud bolt.
- Connect the LH CMP sensor electrical connector and install the coolant tube retainer nut.
- Install the RH CMP sensor and the bolt.
- Install the battery wiring harness, 2 ground wires and the 2 bolts.
- Connect the RH VCT solenoid and the 3 ignition coil-on-plug electrical connectors.
- Connect the 2 turbocharger coolant hoses to the intake manifold and connect the CMP sensor electrical connector.
- Position the fuel tube and install the fuel tube-to-engine front cover bracket bolt and install the coolant tube.
- Connect the Manifold Absolute Pressure (MAP)/Intake Air Temperature 2 (IAT2) sensor electrical connector.
- Connect the KS
sensor electrical connector.
-
NOTE: Apply thread sealant with PTFE to the Engine Oil Pressure (EOP) switch threads.
Install the EOP switch.
- Install the oil filter adapter gasket.
- Using a new gasket, install the oil filter adapter and the 3 bolts.
- Connect the Engine Oil Pressure (EOP) electrical connector.
- Install the stud, generator and the nut and bolt.
- Connect the Throttle Position (TP) sensor, electronic TB, LH Variable Camshaft Timing (VCT) solenoid and the 3 ignition coil-on-plugs electrical connectors.
- Install the noise insulator shield for the fuel injection pump and install the oil level indicator.
- Install the PCV tube and connect the 2 quick connect couplings. Refer to
QUICK CONNECT COUPLING
.
- Connect the lower radiator hose to the thermostat housing.
-
NOTE: The compression limiter bushing may fall out of the mounting bracket grommet on the Charge Air Cooler (CAC) tube during service. Make sure the bushing is in place when reinstalling the tube or damage to the tube may occur.
Install the RH Charge Air Cooler (CAC) tube and turbocharger intake tube as an assembly and install the RH CAC tube nut to the intake manifold.
-
NOTE: Align the index marks for the RH CAC tube.
Install the RH CAC tube to the RH turbocharger and tighten the clamp.
-
NOTE: The compression limiter bushing may fall out of the mounting bracket grommet on the turbocharger intake tube during service. Make sure the bushing is in place when reinstalling the tube or damage to the tube may occur.
Install the RH turbocharger intake tube and the nut.
-
NOTE: Align the index marks for the LH turbocharger intake tube.
Install the LH turbocharger intake tube to the LH turbocharger and tighten the clamp.
- Install the turbocharger bypass valve hose and connect the RH turbocharger bypass valve electrical connector.
- Install the turbocharger wastegate regulating valve hoses to the RH CAC tube and turbocharger wastegate regulating valve.
- Install the bypass valve hose and connect the LH turbocharger bypass valve electrical connector.
- Install the accessory drive belt tensioner and the 3 bolts.
- If equipped, install the block heater wiring harness to the engine.
- If equipped, install the block heater heat shield.
- Install the Special Tool(s): Engine Lift Eye 303-1245.
- Install the Special Tool(s): 2, 200# Floor Crane, Fold Away 303-OTC1819E.
- Remove the engine from the Engine Stand.
Vehicles with cast aluminum (early build) crankshaft rear seal retainer plate
-
NOTE: This step is for the cast aluminum (early build) crankshaft rear seal retainer plate.NOTE: Lubricate the seal lips and bore with clean engine oil prior to installation.
Special Tool(s): Installer, Rear Main Seal 303-1250.
Position the Rear Main Seal Installer onto the end of the crankshaft and slide a new crankshaft rear seal onto the tool.
-
NOTE: This step is for the cast aluminum (early build) crankshaft rear seal retainer plate.
Special Tool(s): Installer, Rear Main Seal 303-1250 and Handle 205-153.
Install the new crankshaft rear seal.
All vehicles
- Install the crankshaft sensor ring.
-
NOTE: One of the 8 flexplate holes are offset so the flexplate can only be installed in one position.