Engine Front Cover: Installation
WARNING: This page is about a different car, the 2009 Ford Mustang. However, it is still accessible from the selected car via links, so may be relevant.
- Apply silicone gasket and sealant in the locations shown.
- Using new gaskets, install the engine front cover and the 16 bolts. Tighten the bolts in the sequence shown:
* Bolts 1 through 14 to 25 Nm (18 lb-ft).
* Bolts 15 and 16 to 50 Nm (37 lb-ft).
Item Part Number Description 1 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 2 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 3 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 4 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 5 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 6 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 7 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 8 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 9 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 10 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 11 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 12 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 13 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 14 N806177 Bolt, hex head pilot, M8 x 1.25 x 53 15 N606063 Bolt, hex flange head pilot, M10 x 1.50 x 55 16 N606063 Bolt, hex flange head pilot, M10 x 1.50 x 55 - Install the 2 oil pan-to-engine front cover bolts and the 2 oil pan-to-engine front cover stud bolts.
- Tighten to 25 Nm (18 lb-ft).
- Using a new gasket, install the coolant pump and the 4 bolts.
- Tighten to 25 Nm (18 lb-ft).
- Using a new gasket, install the oil filter adapter and the 8 bolts.
- Tighten in the sequence shown:
- Bolts 1 through 6 to 25 Nm (18 lb-ft).
- Bolts 7 and 8 to 50 Nm (37 lb-ft).
- Tighten in the sequence shown:
- Connect the EOP switch electrical connector and the 2 wiring harness pin-type retainers.
- Install the 3 coolant tube assembly bolts.
- Tighten to 10 Nm (89 lb-in).
- Install a new engine oil filter in the following sequence.
- Lubricate the oil filter gasket with clean engine oil and tighten until the seal makes contact.
- Using an oil filter strap wrench, tighten the filter an additional 270 degrees.
- Using new gaskets, install the oil cooler and the 6 bolts.
- Tighten in the sequence shown to 10 Nm (89 lb-in).
- Connect the coolant hose to the oil filter adapter.
- Install the generator, 2 bolts and the stud bolt.
- Tighten to 50 Nm (37 lb-ft).
- Install the wire harness retainer bracket on the oil pan stud bolt and install the nut.
- Tighten to 10 Nm (89 lb-in).
- Attach the wiring harness retainer to the oil pan stud bolt.
- Connect the generator electrical connector.
- Connect the B+ wire terminal to the generator and install the nut.
- Tighten to 8 Nm (71 lb-in).
- Using the Engine Support Bars, lower the engine onto the engine support insulators.
- Install the LH and RH engine support insulator nuts.
- Tighten to 63 Nm (46 lb-ft).
- Connect the CKP sensor electrical connector.
- Install the power steering pump and reservoir assembly and the 3 bolts.
- Tighten to 25 Nm (18 lb-ft).
- Install the 2 power steering reservoir bracket bolts.
- Tighten to 25 Nm (18 lb-ft).
- Install the power steering tube bracket bolt.
- Tighten to 10 Nm (89 lb-in).
- Install the power steering tube bracket nut to the generator stud bolt.
- Tighten to 10 Nm (89 lb-in).
- Connect the A/C pressure transducer electrical connector.
- Install the lower radiator hose assembly to the coolant pump, radiator, oil filter adapter and the coolant tube assembly (located above the generator).
- Connect the coolant hoses from the CAC.
- Connect the 2 upper radiator hoses to the intake manifold.
- Connect the 2 coolant vent hoses to the intake manifold.
- Install the crankshaft front seal. For additional information, refer to Crankshaft Front Seal .
- Install the thermostat housing. For additional information, refer to ENGINE COOLING .
- Install the 3 SC drive belt idler pulleys, SC drive belt and the SC drive belt tensioner. For additional information, refer to ACCESSORY DRIVE .
- Install the coolant pump pulley and the 4 bolts.
- Install the 2 accessory drive belt idler pulleys, the accessory drive belt tensioner and the accessory drive belt. For additional information, refer to ACCESSORY DRIVE .
- Tighten the 4 coolant pump pulley bolts to 25 Nm (18 lb-ft).
- Install the RH and LH valve covers. For additional information, refer to Valve Cover - RH and Valve Cover - LH .
- Install the SC coolant degas bottle. For additional information, refer to SUPERCHARGER COOLING .
- Install the engine coolant degas bottle. For additional information, refer to ENGINE COOLING .
- Install the strut tower cross brace and the 4 nuts.
- Tighten to 35 Nm (26 lb-ft).
- Fill the engine with clean engine oil.
- Fill and bleed the SC cooling system. For additional information, refer to SUPERCHARGER COOLING .
- Fill and bleed the engine cooling system. For additional information, refer to ENGINE COOLING .
NOTE:
If the engine front cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with metal surface prep. Allow to dry until there is no sign of wetness or 4 minutes, whichever is longer. Failure to follow this procedure can result in future oil leakage.
NOTE:
Clean and inspect the sealing surfaces with metal surface prep. Follow the directions on the packaging.
NOTE:
Clean the sealing surfaces with metal surface prep. Follow the directions on the packaging. Inspect the mating surfaces.