LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2009 >> Taurus X SEL, FWD >> Repair and Diagnosis (Single Page) >> Body & Frame >> Seats >> Seat System - Seating >> Diagnostic Tests >> Seats >> Pinpoint Tests >> Pinpoint Test AD: The Seat Backrest Will Not Fold Down/Fold Upright - Second Row, 40 Percent (RH or LH) >> Pinpoint Test Ad: The Seat Backrest Will Not Fold Down/Fold Upright - Second Row, 40 Percent (RH Or LH)

Pinpoint Test Ad: The Seat Backrest Will Not Fold Down/Fold Upright - Second Row, 40 Percent (RH Or LH)

  1. AD1 CHECK THE OUTBOARD RECLINER AND CABLES FOR DAMAGE 
    • Remove the outboard recliner outer cover and check for foreign objects, disconnected or damaged cables or obvious damage to the outboard recliner.
    • Pull the release strap and check the outboard recliner operation.
      • The release lever should move smoothly in both directions without binding and return to the rest position with light spring tension.
      • With the strap pulled, the backrest should move forward and rearward in all the recline positions.
      • With the backrest fully upright, release strap pulled fully rearward and with forward pressure applied to the backrest, the backrest should move slightly forward beyond the stopping point.
    • Is there any foreign object, disconnected or damaged cables or obvious damage to the outboard recliner found? 
    1. YES  : REPAIR any disconnected or damaged cables or damaged RH or LH recliner. INSTALL new components as needed. TEST the system for normal operation.
    2. NO  : Go to  AD2.
  2. AD2 CHECK THE RECLINER HANDLE POSITION 
    • Check if the recline handle is pointing downward instead of forward as compared the handle position of the 60 percent seat.
    • Is the recline handle pointing downward? 
    1. YES  : INSTALL a new outboard recliner. REFER to Seat Recliner - Second Row, 40 Percent, Taurus X . TEST the system for normal operation.
    2. NO  : DISASSEMBLE as necessary to CHECK for disconnected or damaged cables or damaged recliners. INSTALL new components as needed. TEST the system for normal operation.