Normal Operation
When the accessory delay relay is energized, voltage is supplied from the smart junction box (SJB) to the door lock control switches (Fusion, Milan), the roof opening panel (if equipped) and the cigar lighter (MKZ) through circuit CBP02 (GN).
This pinpoint test is intended to diagnose the following:
- Fuse
- Wiring, terminals or connectors
- SJB