Valve Cover - RH, 4.6L: Installation
WARNING: This page is about a different car, the 2008 Ford RV Cutaway, 2008 Ford Econoline, 2008 Ford E450 Super Duty, and 2008 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
- Apply instant gel adhesive completely around the gasket groove in the valve cover. Install the new valve cover gasket.
- Apply the silicone gasket and sealant in 2 places where the engine front cover meets the cylinder head.
- Position the valve cover on the cylinder head, and install the fasteners loosely.
- Tighten the valve cover fasteners in the sequence shown.
- Tighten to 10 Nm (89 lb-in).
- Install the PCV valve.
- Connect the PCV electrical connector.
- Position the PCV tube and connect the quick connect couplings. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION - GASOLINE AND DIESEL article.
- Position the fuel charging wiring harness and connect the retainers to the valve cover studs.
- Connect the wiring harness retainer to the heater outlet tube stud bolt.
- Position the bracket, and install the ground strap and the nut. Connect the electrical connectors to the bracket.
- Tighten to 25 Nm (18 lb-ft).
- Connect the engine wiring harness electrical connectors.
- Install the oil filler tube and clamp onto the valve cover.
- Install the engine oil filler tube support bracket bolt.
- Tighten to 9 Nm (80 lb-in).
- Using a suitable jack, raise the engine 57.15 mm (2.25 in).
- Install the LH engine support insulator. For additional information, refer to Engine Support Insulators .
- Install the engine ACL and air cleaner outlet pipe. For additional information, refer to INTAKE AIR DISTRIBUTION AND FILTERING article.
- Install the engine cover. For additional information, refer to INTERIOR TRIM AND ORNAMENTATION article.
NOTE:
If the valve cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with silicone gasket remover and metal surface prep. Follow the directions on the packaging. Allow to dry until there is no sign of wetness, or 4 minutes, whichever is longer. Failure to follow this procedure can cause future oil leakage.
NOTE:
Rotate the PCV valve clockwise to lock it in place.