LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2009 >> Flex Limited, FWD >> Repair and Diagnosis >> Body & Frame >> Windows & Glass - Glass, Frames & Mechanisms >> Diagnosis And Testing >> Glass, Frames and Mechanisms >> Pinpoint Tests >> Pinpoint Test I: The Defrost System Will Not Shut Off Automatically >> Normal Operation

Normal Operation

When the engine is running and the defrost switch (integral to the Front Controls Interface Module (FCIM)) is pressed, the FCIM  sends the defrost request message to the HVAC module over the Controller Area Network (CAN). When the request message is received, the HVAC module activates the rear window defrost relay by grounding the relay coil through circuit CH122 (WH/OG). When the defrost relay is activated, power is supplied from the relay to the rear window defrost grid through circuit CRD06 (BN/YE). Ground is supplied to the rear window defrost grid through circuit GD149 (BK/GY).