Normal Operation
The ignition switch receives fused battery voltage from Smart Junction Box (SJB) fuse 27 (20A) along circuit SBP27 (BU/RD). The ignition switch distributes power from circuit SBP27 (BU/RD) to 1 of 3 circuits depending on the ignition switch position. The ignition switch positions are:
- OFF
- ACC - Power on circuit CDC33 (VT/GN) to the SJB
- RUN - Power on circuit CDC34 (WH/OG) to the SJB and Battery Junction Box (BJB)
- START - Power on circuit CDC35 (BU/WH) to the BJB
and PCM
This pinpoint test is intended to diagnose the following:
- Fuse
- Wiring, terminals or connectors
- Ignition switch
- BJB