Pinpoint Test A: No Communication With The Instrument Cluster
- A1 CHECK THE INSTRUMENT CLUSTER POWER SUPPLY
- Key in OFF position.
- Disconnect: Instrument Cluster.
- Key in ON position.
- Measure the voltage between the instrument cluster, harness side and ground as follows:
PIN SPECIFICATIONInstrument Cluster Connector Pin Circuit C220a 5 1002 (BK/PK) C220a 1 3049 (BK/LG) C220a 14 3049 (BK/LG) C220a 7 640 (RD/YE) - Are the voltages greater than 10 volts?
- Yes : GO to A2.
- No : REPAIR the circuit in question. CLEAR the DTCs. REPEAT the self-test.
- A2 CHECK INSTRUMENT CLUSTER GROUND CIRCUITS 57 (BK) AND 676 (PK/OG)
- Key in OFF position.
- Measure the resistance between the instrument cluster, harness side and ground as follows:
PIN SPECIFICATIONInstrument Cluster Connector Pin Circuit C220a 9 (Expedition/Navigator) 676 (PK/OG) C220a 22 (Expedition/Navigator) 676 (PK/OG) C220a 10 (Expedition) 57 (BK) - Are the resistances less than 5 ohms?
- Yes : REFER to MODULE COMMUNICATIONS NETWORK to continue diagnosis of the communication network.
- No : REPAIR the circuit in question. CLEAR the DTCs. REPEAT the self-test.