Pinpoint Test J: The Defrost System Is Inoperative
- J1 CHECK THE DIAGNOSTIC TROUBLE CODES (DTCS)
- Refer to the results from the previous smart junction box (SJB) self-test
- Was DTC B1345 retrieved?
Yes : GO to J2.
No : GO to J3.
- J2 CHECK CIRCUIT CH122 (WH/OG) FOR A SHORT TO GROUND
- Key in OFF position.
- Disconnect: SJB C2280D.
- Disconnect: EATC C228A or EMTC C2357A.
- Measure the resistance between SJB C2280D-16, circuit CH122 (WH/OG), harness side and ground.
- Is the resistance greater than 10,000 ohms?
Yes : INSTALL a new EATC or EMTC module. REFER to CLIMATE CONTROL . TEST the system for normal operation.
No : REPAIR the circuit. TEST the system for normal operation.
- J3 CHECK THE SJB HEATED BACKLIGHT REQUEST PID
- Key in ON position.
- Monitor the SJB heated backlight request PID while pressing the rear defrost switch.
- Does the SJB heated backlight request PID value agree with the rear defrost switch when pressed?
Yes : GO to J5.
No : GO to J4.
- J4 CHECK CIRCUIT CH122 (WH/OG) FOR AN OPEN CIRCUIT
- Key in OFF position.
- Disconnect: SJB C2280D.
- Disconnect: EATC C228A or EMTC C2357A.
- Measure the resistance between SJB C2280D-16, circuit CH122 (WH/OG), harness side and EATC C228A-10 or EMTC C2357A-10, circuit CH122 (WH/OG), harness side.
- Is the resistance less than 5 ohms?
Yes : INSTALL a new EATC or EMTC module. REFER to CLIMATE CONTROL . TEST the system for normal operation.
No : REPAIR the circuit. TEST the system for normal operation.
- J5 CHECK THE SJB OUTPUT
- Turn the rear defroster ON. Measure the voltage across the rear window defrost grid as shown.
- Is the voltage greater than 10 volts?
Yes : REPAIR the rear window defrost grid or INSTALL a new rear window glass. REFER to WINDOW GRID WIRE REPAIR , WINDOW GLASS - REAR . TEST the system for normal operation.
No : GO to J6.
- J6 CHECK FOR POWER TO THE SJB HEATED BACKLIGHT CIRCUIT
- Key in OFF position.
- Disconnect: SJB C2280A.
- Measure the voltage between SJB C2280A-29, circuit SBB06 (BN/RD), harness side and ground.
- Is the voltage greater than 10 volts?
Yes : GO to J7.
No : VERIFY battery junction box (BJB) fuse 6 (40A) is OK. If OK, REPAIR the circuit. TEST the system for normal operation.
- J7 CHECK CIRCUIT A_CLS38 (VT/WH) VOLTAGE
- Key in OFF position.
- Connect: SJB C2280A.
- Disconnect: Antenna module C402B.
- Key in ON position.
- Turn the rear defroster ON.
- Measure the voltage between antenna module C402B, circuit CLS38 (VT/WH), harness side and ground.
- Is the voltage greater than 10 volts?
Yes : INSPECT antenna module jumper harness for damage and repair as necessary. If jumper harness is OK, INSTALL a new antenna module.
No : VERIFY SJB fuse 8 (30A) is OK. If OK, GO to J8.
- J8 CHECK CIRCUIT A_CLS38 (VT/WH) FOR AN OPEN
- Disconnect: SJB C2280E.
- Key in OFF position.
- Measure the resistance between SJB C2280E-1, circuit CLS38 (VT/WH), harness side and antenna module C402B, circuit CLS38 (VT/WH), harness side.
- Is the resistance less than 5 ohms?
Yes : GO to J9.
No : REPAIR the circuit(s). TEST the system for normal operation.
- J9 CHECK FOR CORRECT SJB OPERATION
- Disconnect all SJB connectors.
- Check for:
- Corrosion.
- Pushed-out pins.
- Connect all SJB connectors and make sure they seat correctly.
- Operate the system and verify the concern is still present.
- Is the concern still present?
Yes : INSTALL a new SJB. REFER to MULTIFUNCTION ELECTRONIC CONTROL MODULES for the removal and installation procedure. TEST the system for normal operation.
No : The system is operating correctly at this time. Concern may have been caused by a loose or corroded connector. CLEAR the DTCs. REPEAT the self-test. TEST the system for normal operation.