LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2003 >> Cutaway 7.3 F >> Repair and Diagnosis >> External Pages >> Different car >> Section 2581 (Engine Mechanical - 6.8L (3V) -- F450 & F550 Super Duty) >> Disassembly And Assembly Of Subassemblies >> Intake Manifold Assembly >> Disassembly

Intake Manifold Assembly: Disassembly

WARNING: This page is about a different car, the 2011 Ford F550 Super Duty and 2011 Ford F450 Super Duty. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect the Evaporative Emission (EVAP) canister purge valve-to-intake manifold quick connect coupling. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION - GASOLINE AND DIESEL article.
  2. Remove the bolt and the EVAP  canister purge valve.
  3. Remove the 4 bolts and the Throttle Body (TB).
    • Discard the TB  gasket.
  4. Remove the 6 bolts and the TB  spacer.
  5. Remove the Intake Manifold Runner Control (IMRC) actuator rod C-clip.
  6. Remove the 3 bolts and the IMRC  actuator.
  7. NOTE: The fuel rail and fuel injectors are removed as an assembly.
  8. Remove the 6 bolts and the fuel rail assembly.
  9. Remove the 10 fuel injector-to-fuel rail locking clips and separate the fuel injectors from the fuel rail.
    • Discard the 2 O-ring seals from each fuel injector.