Removal and Installation
WARNING: This page is about a different car, the 2005 Ford Pickup, 2005 Ford F550 Super Duty, 2005 Ford F450 Super Duty, and 2005 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:
Do not smoke or carry lighted tobacco or open flame of any type when working on or near any fuel-related components. Highly flammable mixtures are always present and can be ignited. Failure to follow these instructions may result in personal injury.
- Disconnect the battery ground cable. For additional information, refer to BATTERY, MOUNTING AND CABLES .
- Remove the throttle body (TB). For additional information, refer to THROTTLE BODY .
- Disconnect the main vacuum harness from the TB spacer.
- Disconnect the PCV tube from the TB spacer.
- Disconnect the EVAP canister purge valve vacuum hose from the TB spacer.
- Disconnect the brake booster vacuum hose.
- Remove the 2 PCV heated element screws.
- Remove the PCV heated element.
- Remove the 2 upper TB spacer bolts.
- To install, tighten to 9 Nm (80 lb-in).
- Tighten an additional 90 degrees.
- Remove the 4 lower TB spacer bolts and the TB.
- Discard the TB spacer gasket.
- To install, tighten to 9 Nm (80 lb-in).
- Tighten an additional 90 degrees.
- Discard the TB spacer gasket.
- To install, reverse the removal procedure.