LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2000 >> Contour SE, 2.5 L, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 243 (Charging System - Generators & Regulators - Excursion, F250-F550 Super Duty (Diesel With Single Generator)) >> On-Vehicle Testing >> Generator Load Test

Generator Load Test

WARNING: This page is about a different car, the 2004 Ford Pickup, 2004 Ford F550 Super Duty, 2004 Ford F450 Super Duty, and 2004 Ford Excursion. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ensure drive belt is in good condition. Replace belt as necessary. If belt is okay, connect charging system load tester in accordance with manufacturer's instructions. Start and run engine at 2000 RPM, and apply load until generator output levels off. Generator amperage should be at least 87 amps with engine at 2000 RPM. Go to next step.
  2. Turn A/C system on. Turn blower speed to high. Turn headlights on to high beams. Voltage should increase a minimum of .5 volts. If voltage is as specified, system is operating properly at this time. If voltage is not as specified, perform GENERATOR NO-LOAD TEST .