Rocker Arm: Installation
WARNING: This page is about a different car, the 2008 Ford Econoline, 2008 Ford E450 Super Duty, and 2008 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
- Install new O-ring seals on the crankcase-to-head tube assemblies.
- Install the valve bridges.
- Install the Rocker Arm Service Tool plate and bolt. Tighten the bolt until the plate contacts the top of the tool base.
- Apply clean engine oil to each end of the push rods and insert them into their respective positions.
- Place a dab of multi-purpose grease in the fulcrum socket to hold the ball in place while installing the rocker arms.
- Insert the rocker arm under the fulcrum and ball, rotate the rocker arm into place and position onto the push rod. Install a new rocker arm retaining clip.
- Repeat the step for the other rocker arm.
- Remove the Rocker Arm Service Tool bolt and plate.
- Make sure the rocker arms remain in place and the fulcrum ball has not fallen out.
- Remove the shop towels.
- Remove the injector hold down and Rocker Arm Service Tool base.
- Install new O-ring seals and copper washer on the fuel injector.
- Install the fuel injector, the fuel injector hold down and bolt.
- Tighten to 35 Nm (26 lb-ft).
- Install the fuel injector electrical connector into the rocker arm carrier.
- Position the high-pressure oil rail on the injectors.
- Place the high-pressure oil rail on top of the carrier so that the 4 single ball tubes are engaging the fuel injector lead angle.
- Insert 3 guide bolts, 2 on the ends of the straight side of the high-pressure oil rail and one in the middle of the wavy side of the high pressure oil rail. Install the guide studs 6 to 7 turns.
- Manually press the high-pressure oil rail into the fuel injectors.
- Inspect that the high-pressure oil rail mounting feet are flat against the mounting surface.
- Loosely install the 6 bolts.
- Install the remaining bolts and tighten.
- Remove the 3 guide bolts.
- Loosely install the 3 remaining bolts.
- Tighten the 9 bolts in the sequence shown to 13 Nm (115 lb-in).
- Apply clean engine oil and install the crankcase-to-head tube(s).
- Tighten to 82 Nm (60 lb-ft).
- If removed, cover the LH cylinder head with an appropriate covering.
- Install the RH high-pressure oil rail-to-valve cover gasket.
- Position the RH valve cover gasket. Install the RH valve cover, 6 stud bolts and 5 bolts.
- Tighten to 9 Nm (80 lb-in).
- Install the engine in the vehicle. For additional information, refer to Engine .
NOTE:
Install new O-ring seals on the crankcase-to-head tube. It requires several hours after installation for the O-ring seals to relax back to their original size. If the tube assembly is installed before the O-ring seals have relaxed, damage to the O-ring seals can occur.
NOTE:
Apply clean engine oil on the valve stems prior to installing the valve bridges.
NOTE:
To prevent engine damage, keep the push rods in the order in which they were removed. Install all push rods back in their original positions.
NOTE:
Apply clean engine oil to the top center of the valve bridges prior to installing the rocker arms.
NOTE:
If the fuel injector oil inlet D-ring is damaged, a new fuel injector must be installed.
NOTE:
Lubricate the fuel injector and O-ring seals liberally with clean engine oil.
NOTE:
To prevent engine damage, do not use air tools when removing and installing the fuel injectors.
NOTE:
Be sure the injector wiring is clear of all moving parts or engine damage can occur.
NOTE:
Using the bolts to push the high-pressure oil rail into the fuel injectors can damage the fuel injectors and high-pressure oil rail.
NOTE:
Apply clean engine oil to the top fuel injector O-ring seals before installing the high-pressure oil rail.
NOTE:
To prevent engine damage, do not use air-powered tools when installing the valve cover.