LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2000 >> Contour SE, 2.5 L, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1905 (Engine - 6.8L (3V) -- F250-F550 Super Duty) >> In-Vehicle Servicing >> Valve Cover - LH >> Installation

Valve Cover - LH: Installation

WARNING: This page is about a different car, the 2007 Ford Pickup, 2007 Ford F550 Super Duty, 2007 Ford F450 Super Duty, and 2007 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE: If the valve cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with silicone gasket remover and metal surface prep. Follow the directions on the packaging. Allow to dry until there is no sign of wetness, or 4 minutes, whichever is longer. Failure to follow this procedure can cause future oil leakage.
    Fig 1: Identifying Silicone Gasket And Sealant Application Points
    GF0005565Courtesy of FORD MOTOR CO.
  1. Apply a bead of silicone gasket and sealant in 2 places where the engine front cover meets the cylinder head.
  2. Position the LH valve cover and new gasket on the cylinder head and tighten the 17 fasteners in the sequence shown
    • Tighten to 10 N.m (89 lb-in).
    Fig 2: Identifying Valve Cover Fasteners Tightening Sequence
    G03920580Courtesy of FORD MOTOR CO.
  3. Position the engine wiring harness retainers onto the valve cover studs.
  4. Position the PCV tube and connect the quick connect couplings. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION - GASOLINE AND DIESEL article.
  5. Position the degas bottle and install the 2 bolts.
    • Tighten to 10 N.m (89 lb-in).
    Fig 3: Locating Degas Bottle Bolts
    GF0005564Courtesy of FORD MOTOR CO.
  6. Install the LH ignition coils. For additional information, refer to ENGINE IGNITION - 5.4L AND 6.8L (3V) article.
  7. Install the oil level indicator and tube. For additional information, refer to Oil Level Indicator and Tube  in this article.
  8. Install the air cleaner outlet tube. For additional information, refer to INTAKE AIR DISTRIBUTION AND FILTERING article.