LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2000 >> Contour SE, 2.5 L, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1806 (Engine - 5.4L (3V) - F-150 & Mark LT) >> In-Vehicle Servicing >> Valve Cover - RH >> Installation >> All vehicles

All vehicles

WARNING: This page is about a different car, the 2007 Lincoln Mark LT and 2007 Ford Pickup. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE: If the valve cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with silicone gasket remover and metal surface prep. Follow the directions on the packaging. Allow to dry until there is no sign of wetness, or 4 minutes, whichever is longer. Failure to follow this procedure can cause future oil leakage.
    Fig 1: Applying Bead Of Silicone Gasket And Sealant In 2 Places Where Engine Front Cover Meets Cylinder Head
    G03919863Courtesy of FORD MOTOR CO.
  1. Apply a bead of silicone gasket and sealant in 2 places where the engine front cover meets the cylinder head.


  1. Position the transmission fluid level indicator tube and install the bolt.
    • Tighten to 20 Nm (15 lb-ft).
    Fig 1: Identifying Transmission Filler Tube Retaining Bolt
    G03964058Courtesy of FORD MOTOR CO.
  2. Install the battery cover.
  3. Position the engine harness and attach the retainer.
    Fig 2: Positioning Engine Harness And Attaching Retainer
    GF0002739Courtesy of FORD MOTOR CO.
  4. Connect the VCT solenoid electrical connector.
  5. If equipped, connect the vacuum tube.
    Fig 3: Connecting Vacuum Tube
    GF0002738Courtesy of FORD MOTOR CO.
  6. Position the crankcase ventilation tube and connect the quick connect couplings. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION article.
  7. Using new O-rings, connect the evaporator inlet tube fitting.
    Fig 4: Locating Evaporator Inlet Tube Fitting
    GF0002737Courtesy of FORD MOTOR CO.
  8. Install the suction accumulator-to-A/C compressor manifold tube stud.
    • Tighten to 8 Nm (71 lb-in).
  9. Lubricate the new A/C compressor manifold tube O-ring seals with refrigerant compressor oil. Position the A/C compressor manifold tube and install the nut.
    • Tighten to 25 Nm (18 lb-ft).
  10. Install the RH ignition coils. For additional information, refer to ENGINE IGNITION - 5.4L (3V) article.
  11. Install the PCM bracket and the PCM. For additional information, refer to ELECTRONIC ENGINE CONTROLS article.
  12. Evacuate, leak test and charge the refrigerant system. For additional information, refer to CLIMATE CONTROL SYSTEM - GENERAL INFORMATION AND DIAGNOSTICS article.