Oil Pump: Installation
WARNING: This page is about a different car, the 2005 Ford RV Cutaway, 2005 Ford Econoline, 2005 Ford E450 Super Duty, and 2005 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
- Install a new O-ring seal on the high-pressure oil pump.
- Install the high-pressure tube assembly.
- Install new lower O-ring seals.
- Install the high-pressure pump and bolts.
- Tighten the bolts for the high-pressure tube assembly.
- Position the dial indicator with bracketry onto the oil pump drive and check the oil pump drive gear backlash.
- Install a new press-in-place gasket in the high-pressure pump cover.
- Clean the cover mounting surface and apply sealer at the seams.
- Install the high-pressure oil pump cover and remaining bolts.
- Install the IPR valve.
- Install the heat insulating wrap and fasten the snap.
- Connect the IPR valve electrical connector and position back the heat insulating wrap.
- Install the turbocharger heat shield and bolts.
- Install the turbocharger. For additional information, refer to FUEL CHARGING & CONTROLS - TURBOCHARGER .
CAUTION:
To prevent engine damage, use only an approved pump cover seal. Substitution could cause damage to the pump cover.
CAUTION:
To prevent engine damage, use care when installing the high-pressure pump cover with fasteners. The three bolts in the cover could fall out of the cover and fall down in the engine under the high-pressure pump.
CAUTION:
To prevent engine damage, the high-pressure oil pump cover must be firmly seated on the O-ring seal to prevent cracking the cover plate.
NOTE:
Apply clean engine oil to the high-pressure oil pump O-ring seal prior to installing the high-pressure pump cover.