Shift Concerns: Timing - Early/Late
WARNING: This page is about a different car, the 2002 Mercury Villager. However, it is still accessible from the selected car via links, so may be relevant.
SHIFT CONCERNS: TIMING - EARLY/LATE SPECIFICATION
| Possible Component |
Reference/Action |
| 209 - ELECTRICAL ROUTINE |
| Powertrain Control System |
- Electrical inputs/outputs, vehicle wiring harnesses, transaxle control module (TCM), shift solenoids, TP, TFT, OSS sensors, internal wire harness, EPC solenoid.
|
|
| 309 - HYDRAULIC/MECHANICAL ROUTINE |
| Other |
- Tire size chain ratio-change, speedometer gear
|
- Refer to the specification decal and verify vehicle has original equipment. Changes in tire size and chain ratio will affect shift timing.
|
| Fluid |
|
|
- Adjust the fluid to the proper level.
|
| Shift Linkage |
- Damaged, out of adjustment
|
- Inspect. Repair as required. Verify linkage adjustment; refer to
AUTOMATIC TRANSAXLE/TRANSMISSION EXTERNAL CONTROLS
.
|
| Main Control Valve Body |
- Bolts out of torque specification
|
- Tighten bolts to specification.
|
- Gaskets and separator plate-damaged, off location
|
- Inspect for damage. Install new components as necessary.
|
- Valves, accumulators, seals, springs, clips-damaged, missing, incorrectly assembled
|
- Inspect for damage and contamination. Install new components as necessary.
- Refer to the appropriate shift table for further diagnosis:
- Shift concern: soft/slipping 1-2-Routine 226/326
- Shift concern: soft/slipping 2-3-Routine 227/327
- Shift concern: soft/slipping 3-4-Routine 228/328
- Shift concern: soft/slipping 4-3-Routine 229/329
- Shift concern: soft/slipping 3-2-Routine 230/330
- Shift concern: soft/slipping 2-1-Routine 231/331
|
| Planetary Gear Sets |
|
|
- Inspect for damage. Install new components as necessary.
|
| Other Components |
|
|
- Inspect for damage. Install new components as necessary.
|
- Output shaft (differential)
|
- Inspect for damage. Install new components as necessary.
|
|
|
- Inspect for damage. Install new components as necessary.
|
|
|
- Inspect for damage. Install new components as necessary.
|