LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2000 >> Contour SE, 2.0 3, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1612 (Cruise Control System -- F250-F550 Super Duty) >> Diagnosis And Testing >> Speed Control >> Pinpoint Tests >> Pinpoint Test H: DTC P0833 - Clutch Pedal Switch B Circuit - Diesel >> Pinpoint Test H: DTC P0833 - Clutch Pedal Switch B Circuit - Diesel

Pinpoint Test H: DTC P0833 - Clutch Pedal Switch B Circuit - Diesel

WARNING: This page is about a different car, the 2006 Ford Pickup, 2006 Ford F550 Super Duty, 2006 Ford F450 Super Duty, and 2006 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
  1. H1 CHECK THE CPP SWITCH 
    • Key in OFF position.
    • Disconnect: PCM C1381a.
    • While pressing and releasing the clutch pedal, measure the voltage between the PCM C1381a-36, circuit 306 (TN/LB), harness side and ground.
      Fig 1: Checking CPP Switch
      G04651333Courtesy of FORD MOTOR CO.
    • Is the voltage greater than 10 volts with the clutch pedal released, and less than 1 volt with the clutch pedal pressed? 

    Yes  : Go to  H5.

    No  : Go to H2.

  2. H2 CHECK CIRCUIT 306 (TN/LB) FOR A SHORT TO VOLTAGE 
    • Disconnect: CPP Switch C257.
    • Measure the voltage between the PCM C1318a-36, circuit 306 (TN/LB), harness side and ground.
      Fig 2: Checking Circuit 306 (TN/LB) For Short To Voltage
      G04651334Courtesy of FORD MOTOR CO.
    • Is any voltage present? 

    Yes  : REPAIR the circuit. TEST the system for normal operation.

    No  : Go to H3.

  3. H3 CHECK CIRCUIT 306 (TN/LB) FOR AN OPEN 
    • Disconnect: CPP Switch C257.
    • Measure the resistance between the PCM C1381a-36, circuit 306 (TN/LB), harness side and the CPP switch C257-4, circuit 306 (TN/LB), harness side.
      Fig 3: Checking Circuit 306 (TN/LB) For Open
      G04651335Courtesy of FORD MOTOR CO.
    • Is the resistance less than 5 ohms? 

    Yes  : Go to H4.

    No  : REPAIR the circuit. TEST the system for normal operation.

  4. H4 CHECK CIRCUIT 640 (RD/YE) FOR AN OPEN 
    • Measure the voltage between the CPP switch C257-3, circuit 640 (RD/YE), harness side and ground.
      Fig 4: Checking Circuit 640 (RD/YE) For Open
      G04651336Courtesy of FORD MOTOR CO.
    • Is the voltage greater than 10 volts? 

    Yes  : INSTALL a new CPP switch. TEST the system for normal operation.

    No  : VERIFY the central junction box (CJB) fuse 45 (10A) is OK. If OK, REPAIR the circuit. CLEAR the DTCs. REPEAT the self-test.

  5. H5 CHECK FOR CORRECT PCM OPERATION 
    • Disconnect all the PCM connectors.
    • Check for:
      • corrosion
      • pushed-out pins
    • Connect all the PCM connectors and make sure they are seated correctly.
    • Operate the system and verify the concern is still present.
    • Is the concern still present? 

    Yes  : INSTALL a new PCM. REFER to ELECTRONIC ENGINE CONTROLS - GASOLINE ENGINES . CLEAR the DTCs. REPEAT the self-test.

    No  : The system is operating correctly at this time. The concern may have been caused by a loose or corroded connector.