LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 1996 >> Aerostar Van Window >> Repair and Diagnosis >> External Pages >> Different car >> Section 151 (7.5L V8 - VIN [G]) >> Removal & Installation >> Intake Manifolds >> Installation

Intake Manifolds: Installation

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 1995 Ford RV Cutaway, 1995 Ford Pickup, 1995 Ford F-Super Duty, 1995 Ford Econoline, and 1995 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.

Clean all gasket surfaces. Position NEW gasket on lower intake manifold. Ensure NEW gasket is aligned. To complete installation, reverse removal procedure. Tighten bolts to specification. See TORQUE SPECIFICATIONS .



  1. Clean all gasket surfaces. Apply 1/8" (3 mm) bead of silicone sealer to 4 corners of cylinder block seal mounting surface. Install manifold gasket, front seal and rear seal. Apply 1/16" (1.5 mm) bead silicone sealer along full width of front and rear seal ends.
  2. Install intake manifold within 15 minutes of applying sealer. Position intake manifold over 4 studs in cylinder heads. Check gasket and seal alignment before tightening.
  3. Install manifold attaching bolts, studs and nuts. Tighten bolts in sequence to specification. See Fig 1. See, in this article, TORQUE SPECIFICATIONS . Install fuel lines, electrical connectors and vacuum hoses. To install remaining components, reverse removal procedure.
  4. Fill cooling system. Bleed air from system. Refer to COOLING SYSTEM BLEEDING . Check and adjust ignition timing as necessary. Start engine and allow it to reach operating temperature. Turn off engine. Retighten bolts and nuts sequentially to 22-35 ft. lbs. (30-47 N.m) to complete installation.
Fig 1: Lower Intake Manifold Tightening Sequence
G95G26993Courtesy of FORD MOTOR CO.